My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. All final Elevations to be plotted on PGL AND Plan & Profile sheets as <br />applicable. <br />4. Elevations of edge of pavement and flow line at curb inlets and on the adjacent <br />edge of pavement at curb inlets. <br />WATER, FORCE, AND RECLAIMED WATER MAINS: <br />1. Show size and type of material used to construct mains. <br />2. Show horizontal location and elevation of all tees, crosses, bends, terminal <br />ends, valves, fire hydrants, air release valves, and sampling points, etc., by <br />distances from known reference points. <br />3. Show location, size and type of material of all sleeves and casing pipes. <br />4. Elevation and horizontal location of all storm sewers, gravity sewers including <br />laterals, force mains, water mains, etc. which are crossed; including <br />clearance dimension at all conflicts or crossings. <br />5. Top of pipe elevation and horizontal location of all water and force main stub - <br />outs. <br />6. Horizontal location of all services at the property lines. <br />7 Horizontal and vertical location of pipe including size of all mains and ground <br />elevation shall be obtained at one -hundred (100) foot intervals. Contractor <br />shall place temporary PVC stand pipes (tell -tales) at each of the one - <br />hundred (100) foot intervals and at all fittings and conflicts/crossings to <br />facilitate the record drawing survey. The tell-tale pipes shall be constructed <br />of 2 -inch PVC pipe, shall be placed on the top of the pipes to be surveyed, <br />and shall be removed by the Contractor after completion of the field survey <br />by the "As -Built" Professional Surveyor. <br />8. Location of fire lines. <br />9. Dedicated easement locations, identified by O.R. Book and Page Number. <br />GRAVITY SEWER: <br />1. Manholes: Elevation of top rim, bottom elevation and invert of each influent <br />and effluent line. <br />2. Show distance between manholes center -to -center and horizontal location by <br />baseline station and offset. <br />3. Show material size and type used to construct sewer mains. <br />4. Show length (center of manhole to end of stub) distances from known <br />reference points or baseline offsets, and elevation of stub -outs. <br />5. Show which services have twenty (20) foot length of DIP at water main <br />crossings. <br />6. Show station and offset location of sanitary services' at property line. <br />Particular care in dimensioning needed in special situations, i.e., cul-de-sacs <br />and locations where services are not perpendicular to wye. <br />7 Show invert elevation of sanitary service at property line. <br />8. Any and all necessary dedicated easement locations, identified by O.R. Book <br />and Page Number. <br />01025-16 Technical Specifications <br />F:\Pubiic Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents Master Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.