Laserfiche WebLink
D. All Record/As-Built drawings are subject to review and approval by County <br />Surveyor. <br />ACCURACY <br />The CONTRACTOR will be held responsible for the accuracy and completeness of <br />Record Drawings and Electronic As-Builts and shall bear any costs incurred in finding <br />utilities as a result of incorrect data furnished by the CONTRACTOR. <br />COMPLETION OF WORK <br />Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings <br />to ENGINEER. Final payment will not be made until satisfactory record documents are <br />received and approved by ENGINEER. <br />AERIAL PHOTOGRAPH <br />The CONTRACTOR shall provide aerial photographs of the project every 30 days <br />during construction. The photographs shall be done in a manner to show the <br />construction progress for the entire length of the project. The photographs can be <br />angled and not prepared to a particular scale, however, must be detailed enough to <br />identify the work in detail. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 4 — Record Drawings/As-Built Drawings (To include Construction <br />Stake -out) - Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-18 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documentsWlaster Contract <br />Documents\Technical Specifications.doc <br />