My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and <br />Regulations that may affect cost, progress and performance of the Work. <br />D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface <br />conditions at or contiguous to the Site and all drawings of physical conditions in or relating to <br />existing surface or subsurface structures at or contiguous to the Site (except Underground <br />Facilities) which have been identified in the Supplementary Conditions as provided in <br />paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous <br />Environmental Condition, if any, which have been identified in the Supplementary Conditions <br />as provided in paragraph 4.06 of the General Conditions. <br />E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) <br />all additional or supplementary examinations, investigations, explorations, tests, studies and <br />data conceming conditions (surface, subsurface and Underground Facilities) at or contiguous <br />to the Site which may affect cost, progress, or performance of the Work or which relate to any <br />aspect of the means, methods, techniques, sequences, and procedures of construction to be <br />employed by Bidder, including applying the specific means, methods, techniques, sequences, <br />and procedures of construction expressly required by the Bidding Documents to be employed <br />by Bidder, and safety precautions and programs incident thereto. <br />F. Bidder does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the determination of this Bid for performance of the Work at <br />the price(s) bid and within the times and in accordance with the other terms and conditions of <br />the Bidding Documents. <br />G. Bidder is aware of the general nature of work to be performed by OWNER and others at <br />the Site that relates to the Work as indicated in the Bidding Documents. <br />H. Bidder has correlated the information known to Bidder, information and observations <br />obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and <br />all additional examinations, investigations, explorations, tests, studies, and data with the <br />Bidding Documents. <br />I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution <br />thereof by ENGINEER is acceptable to Bidder. <br />J. The Bidding Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for the performance of the Work for which this Bid is submitted. <br />4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on <br />behalf of any undisclosed individual or entity and is not submitted in conformity with any <br />agreement or rules of any group, association, organization or corporation; Bidder has not <br />directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; <br />Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder <br />has not sought by collusion to obtain for itself any advantage over any other Bidder or over <br />OWNER. <br />[The remainder of page intentionally left blank] <br />00310 - Bid Form REV 04-07 <br />00310 - 2 <br />F:1PublIc Works ENGINEERING DIVISION PROJECTS11413-Martin Luther King Walking TraiMdminthid documents\Master Contract Documents100310 - Bid Form REV 04- <br />07.doc Rev. 05/16/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.