Laserfiche WebLink
ITEMIZED BID SCHEDULE <br />PROJECTNAME:NAME: MARTIN LUTHER KING WALKING TRAIL <br />IR <br />BIDDER'S NAME: 1413/2015034 \/ <br />ADDENDUM #1 4-21-15 <br />IteinNoDascnptton ..��..., ,1-.5,;,,I;1.4.1-:14,,,&,,,3:4:7.-:-?:!.::-.. _.,, .:_•. r -=.._, 4uanttty, .,Um ,'l9nrtPrtce . ---4-.Amount <br />TRAIL IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />/fTi 00 <br />/5,000- " <br />2 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />ZS00 • <br />ZS00,00 <br />3 <br />EROSION & WATER POLLUTION CONTROL <br />1 <br />LS <br />9fOO <br />.S'T'O,00 <br />4 <br />RECORD DRAWING/AS-BUILT DRAWINGS (TO INCLUDE <br />CONSTRUCTION STAKEOUT) <br />1 <br />LS <br />&0a). <br />(.0 000 ao <br />5 <br />CLEARING & GRUBBING (TO INCLUDE REMOVAL OF <br />EXISTING SIDEWALK AS SHOWN ON PLANS) <br />1 <br />LS <br />32,100 <br />32,7C0." <br />6 <br />EARTHWORK (TO INCLUDE EXCAVATION, EMBANKMENT, <br />AND GRADING) <br />1 <br />LS <br />ng6-0, <br />i% $ S,0° <br />7 <br />TYPE B STABILIZATION - (6" SUBGRADE LBR 401 <br />110 <br />SY <br />Is." <br />'Gs -0.0o <br />8 <br />ASPHALT MILLINGS (8" THICK COMPACTED) (TWO LIFTS) <br />3,250 <br />SY <br />1,50S. <br />Zy,$(pZ Sn <br />PIPE-HANDRAILlGUIDERAIL(STEEL) _ .... <br />...-.._52 —_LF_ <br />GS -=00 : <br />-3360 o0 <br />9 <br />10 <br />CONCRETE SIDEWALK (6") (THICK) <br />135 <br />SY <br />ao'35 <br />49 O" ZS <br />11 <br />PERFORMANCE TURF - SOD (BAHIA) (INCLUDES: TOP <br />SOIL, FERTILIZER, AND WATERING) <br />1,127 <br />SY <br />SS <br />Z‘ <br />213 35 <br />TRAIL IMPROVEMENTS SUB TOTAL <br />1171 1Z3 85 <br />MISCELLANEOUS <br />12 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />11000 <br />/600.00 <br />FA -1 <br />FORCE ACCOUNT <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />MISCELLANEOUS 'SUB TOTAL <br />/ /1 (000.0" <br />OVERALL PROJECT TOTAL <br />/215172:31 <br />TOTAL PROJECT BID AMOUNT (IN WORDS):0IV., w KLC�f'�I 1' t Ei,e FTh nu56 J <br />,► ('. <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF = Linear Foot SY = Square Yard <br />F:\Public Works \ ENGINEERING DIVISION PROJECTS 11413 -Martin Luther King Walking Treil\Admin\bid documents\ADDENDUM 1\Itemized Bid Schedule -1413 ADD 1 <br />00310 - Bid Form REV 04-07 <br />00310-3 <br />