Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project consists of the construction of a 2650± LF by 12' wide asphalt <br />millings walking trail. This walking trail loops through two properties in the Gifford <br />Community located at the corner of 45' Street and 28th Court. One is the current site of <br />the Historic Macedonia Baptist Church and the other property is the Gifford Health <br />Center. Also included with project will be clearing and grubbing, grading and sodding. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: Martin Luther King Walking Trail <br />County Project Number: 1413 <br />Bid Number: 2015034 <br />Project Address: 2880 45th Street & 2625 28th Court Vero Beach, FL. <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 06-14 <br />00520 - 2 <br />B \2014-2015 FY (2015000)\2015034 - MLK Walking Trail \00520 - Agreement (Public Works) REV 06-14_doc <br />