Laserfiche WebLink
* <br />ADDENDUM #1 4-21-15 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: MARTIN LUTHER KING WALKING TRAIL <br />IRC PROJECT NO./BID NO.: 1413/2015034 <br />BIDDER'S NAME: <br />Item No <br />Description Quantity Unit Unit Price : <br />Amount <br />TRAIL IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />2 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />3 <br />EROSION & WATER POLLUTION CONTROL <br />1 <br />LS <br />4 <br />RECORD DRAWING/AS-BUILT DRAWINGS (TO INCLUDE <br />CONSTRUCTION STAKEOUT) <br />1 <br />LS <br />5 <br />CLEARING & GRUBBING (TO INCLUDE REMOVAL OF <br />EXISTING SIDEWALK AS SHOWN ON PLANS) <br />1 <br />LS <br />6 <br />EARTHWORK (TO INCLUDE EXCAVATION, EMBANKMENT, <br />AND GRADING) <br />1 <br />LS <br />7 <br />TYPE B STABILIZATION - (6" SUBGRADE LBR 40) <br />110 <br />SY <br />8 <br />ASPHALT MILLINGS (8" THICK COMPACTED) (TWO LIFTS) <br />3,250 <br />SY <br />9 <br />PIPE HANDRAIL/GUIDERAIL (STEEL) <br />52 <br />LF <br />10 <br />CONCRETE SIDEWALK (6") (THICK) <br />135 <br />SY <br />11 <br />PERFORMANCE TURF - SOD (BAHIA) (INCLUDES: TOP <br />SOIL, FERTILIZER, AND WATERING) <br />1,127 <br />SY <br />TRAIL IMPROVEMENTS SUB TOTAL <br />MISCELLANEOUS <br />12 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />FA -1 <br />FORCE ACCOUNT <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />MISCELLANEOUS SUB TOTAL <br />OVERALL PROJECT TOTAL <br />TOTAL PROJECT BID AMOUNT (IN WORDS): <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF = Linear Foot SY = Square Yard <br />00310-3 <br />F:\Public WorksVENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\ Mdmin\bid documents\ADDENDUM 1\Itemized Bid Schedule -1413 ADD 1 <br />