My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* <br />ADDENDUM #1 4-21-15 <br />ITEMIZED BID SCHEDULE <br />PROJECT NAME: MARTIN LUTHER KING WALKING TRAIL <br />IRC PROJECT NO./BID NO.: 1413/2015034 <br />BIDDER'S NAME: <br />Item No <br />Description Quantity Unit Unit Price : <br />Amount <br />TRAIL IMPROVEMENTS <br />1 <br />MOBILIZATION <br />1 <br />LS <br />2 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />3 <br />EROSION & WATER POLLUTION CONTROL <br />1 <br />LS <br />4 <br />RECORD DRAWING/AS-BUILT DRAWINGS (TO INCLUDE <br />CONSTRUCTION STAKEOUT) <br />1 <br />LS <br />5 <br />CLEARING & GRUBBING (TO INCLUDE REMOVAL OF <br />EXISTING SIDEWALK AS SHOWN ON PLANS) <br />1 <br />LS <br />6 <br />EARTHWORK (TO INCLUDE EXCAVATION, EMBANKMENT, <br />AND GRADING) <br />1 <br />LS <br />7 <br />TYPE B STABILIZATION - (6" SUBGRADE LBR 40) <br />110 <br />SY <br />8 <br />ASPHALT MILLINGS (8" THICK COMPACTED) (TWO LIFTS) <br />3,250 <br />SY <br />9 <br />PIPE HANDRAIL/GUIDERAIL (STEEL) <br />52 <br />LF <br />10 <br />CONCRETE SIDEWALK (6") (THICK) <br />135 <br />SY <br />11 <br />PERFORMANCE TURF - SOD (BAHIA) (INCLUDES: TOP <br />SOIL, FERTILIZER, AND WATERING) <br />1,127 <br />SY <br />TRAIL IMPROVEMENTS SUB TOTAL <br />MISCELLANEOUS <br />12 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />FA -1 <br />FORCE ACCOUNT <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />MISCELLANEOUS SUB TOTAL <br />OVERALL PROJECT TOTAL <br />TOTAL PROJECT BID AMOUNT (IN WORDS): <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF = Linear Foot SY = Square Yard <br />00310-3 <br />F:\Public WorksVENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\ Mdmin\bid documents\ADDENDUM 1\Itemized Bid Schedule -1413 ADD 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.