Laserfiche WebLink
TABLE OF CONTENTS <br />Title Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 5 <br />1.01 Defined Terms 5 <br />1.02 Terminology 7 <br />ARTICLE 2 - PRELIMINARY MATTERS 8 <br />2.01 Delivery of Bonds 8 <br />2.02 Copies of Documents 8 <br />2.03 Commencement of Contract Times; Notice to Proceed 8 <br />2.04 Starting the Work 8 <br />2.05 Before Starting Construction 8 <br />2.06 Preconstruction Conference 9 <br />2.07 Initial Acceptance of Schedules 9 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 9 <br />3.01 Intent 9 <br />3.02 Reference Standards 10 <br />3.03 Reporting and Resolving Discrepancies 10 <br />3.04 Amending and Supplementing Contract Documents 10 <br />3.05 Reuse of Documents 10 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br />POI NTS 11 <br />4.01 Availability of Lands 11 <br />4.02 Subsurface and Physical Conditions 11 <br />4.03 Differing Subsurface or Physical Conditions 11 <br />4.04 Underground Facilities 12 <br />4.05 Reference Points 13 <br />4.06 Hazardous Environmental Condition at Site 13 <br />ARTICLE 5 - BONDS AND INSURANCE 14 <br />5.01 Performance, Payment, and Other Bonds 14 <br />5.02 Licensed Sureties and Insurers 15 <br />5.03 Certificates of Insurance 15 <br />5.04 CONTRACTOR's Liability Insurance 15 <br />5.05 0WNER's Liability Insurance 16 <br />5.06 Property Insurance 16 <br />5.07 Waiver of Rights 17 <br />5.08 Receipt and Application of Insurance Proceeds 18 <br />5.09 Acceptance of Bonds and Insurance; Option to Replace 18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer 18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 18 <br />6.01 Supervision and Superintendence 18 <br />6.02 Labor, Working Hours 18 <br />6.03 Services, Materials, and Equipment 19 <br />6.04 Progress Schedule 19 <br />6.05 Substitutes and "Or -Equals" 19 <br />6.06 Concerning Subcontractors, Suppliers, and Others 21 <br />00700 - General Conditions REV 5-10-13 <br />00700 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking Trail\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10-13 .doc <br />