My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereby; however, CONTRACTOR shall not be liable <br />to OWNER or ENGINEER for failure to report any <br />conflict, error, ambiguity, or discrepancy in the <br />Contract Documents unless CONTRACTOR knew or <br />reasonably should have known thereof: <br />B. Preliminary Schedules: Within ten days after <br />the Effective Date of the Agreement (unless otherwise <br />specified in the General Requirements), CONTRAC- <br />TOR shall submit to ENGINEER for its timely review: <br />1. a preliminary progress schedule <br />indicating the times (numbers of days or dates) <br />for starting and completing the various stages <br />of the Work, including any Milestones specified <br />in the Contract Documents; <br />2. a preliminary schedule of Shop <br />Drawing and Sample submittals which will list <br />each required submittal and the times for sub- <br />mitting, reviewing, and processing such <br />submittal; and <br />3. a preliminary schedule of values for <br />all of the Work which includes quantities and <br />prices of items which when added together <br />equal the Contract Price and subdivides the <br />Work into component parts in sufficient detail to <br />serve as the basis for progress payments <br />during performance of the Work. Such prices <br />will include an appropriate amount of overhead <br />and profit applicable to each item of Work. <br />C. Evidence of Insurance: Before any Work at <br />each deliver to the other, with copies to each <br />additional insured identified in the Supplementary <br />Conditions, certificates of insurance (and other <br />additional insured may reasonably request) which <br />CONTRACTOR and OWNER respectively arc <br />Article 5. <br />2.06 Preconstruction Conference <br />conference attended by CONTRACTOR, ENGINEER, <br />and others as appropriate will be held to establish a <br />Work and to discuss the schedules referred to in para <br />graph 2.05.B, procedures for handling Shop Drawings <br />2.07 Initial Acceptance of Schedules <br />A. Unless otherwise provided in the Contract <br />Documents, at least ten days before submission of the <br />first Application for Payment a conference attended by <br />CONTRACTOR, ENGINEER, and others as appropri- <br />ate will be held to review for acceptability to ENGI- <br />NEER as provided below the schedules submitted in <br />accordance with paragraph 2.05.B. CONTRACTOR <br />shall have an additional ten days to make corrections <br />and adjustments and to complete and resubmit the <br />schedules. No progress payment shall be made to <br />CONTRACTOR until acceptable schedules are <br />submitted to ENGINEER. <br />1. The progress schedule will be <br />acceptable to ENGINEER if it provides an <br />orderly progression of the Work to completion <br />within any specified Milestones and the <br />Contract Times. Such acceptance will not <br />impose on ENGINEER responsibility for the <br />progress schedule, for sequencing, scheduling, <br />or progress of the Work nor interfere with or <br />relieve CONTRACTOR from CONTRACTOR's <br />full responsibility therefor. <br />2. CONTRACTOR's schedule of Shop <br />Drawing and Sample submittals will be <br />acceptable to ENGINEER if it provides a <br />workable arrangement for reviewing and <br />processing the required submittals. <br />3. CONTRACTOR's schedule of values <br />will be acceptable to ENGINEER as to form <br />and substance if it provides a reasonable <br />allocation of the Contract Price to component <br />parts of the Work. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, <br />AMENDING, REUSE <br />3.01 Intent <br />A. The Contract Documents are comple- <br />mentary; what is called for by one is as binding as if <br />called for by all. <br />B. It is the intent of the Contract Documents to <br />describe a functionally complete Project (or part there- <br />of) to be constructed in accordance with the Contract <br />Documents. Any labor, documentation, services, <br />materials, or equipment that may reasonably be <br />inferred from the Contract Documents or from <br />prevailing custom or trade usage as being required to <br />produce the intended result will be provided whether <br />or not specifically called for at no additional cost to <br />OWNER. <br />00700 - General Conditions REV 5-10-13 <br />00700 - 9 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking TrailWdmin\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.