My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. include contractual liability insurance <br />covering CONTRACTOR's indemnity <br />obligations under paragraphs 6.07, 6.11, and <br />6.20; <br />5. contain a provision or endorsement <br />that the coverage afforded will not be canceled, <br />materially changed or renewal refused until at <br />least thirty days prior written notice has been <br />given to OWNER and CONTRACTOR and to <br />each other additional insured identified in the <br />Supplementary Conditions to whom a certificate <br />of insurance has been issued (and the <br />certificates of insurance furnished by the CON- <br />TRACTOR pursuant to paragraph 5.03 will so <br />provide); <br />6. remain in effect at least until final <br />payment and at all times thereafter when CON- <br />TRACTOR may be correcting, removing, or <br />replacing defective Work in accordance with <br />paragraph 13.07; and <br />7. with respect to completed operations <br />insurance, and any insurance coverage written <br />on a claims -made basis, remain in effect for at <br />least two years after final payment (and <br />CONTRACTOR shall furnish OWNER and <br />each other additional insured identified in the <br />Supplementary Conditions, to whom a <br />certificate of insurance has been issued, <br />evidence satisfactory to OWNER and any such <br />additional insured of continuation of such <br />insurance at final payment and one year <br />thereafter). <br />5.05 OWNER'S Liability Insurance <br />A. In addition to the insurance required to be <br />provided by CONTRACTOR under paragraph 5.04, <br />OWNER, at OWNER's option, may purchase and <br />Documents. <br />5.06 Property Insurance <br />A. Unless otherwise provided in the Supple <br />rnentary Conditions, OWNER shall purchase and <br />maintain property insurance upon thc Work at the Site <br />provided in the Supplementary Conditions or required <br />by Laws and Regulations). This insurance shall: <br />1. include the interests of OWNER, <br />CONTRACTOR, Subcontractors, ENGINEER, <br />ENGINEER's Consultants, and any other <br />individuals or entities identified in thc <br />Supplementary Conditions, and the officers, <br />directors, partners, employees, agents, and <br />other consultants and subcontractors of each <br />and any of them, each of whom is deemed to <br />have an insurable interest and shall be listed as <br />2. be written on a Builder's Risk "all risk" <br />or open peril or special causes of loss policy <br />form that shall at least include insurance for <br />physical losc or damage to the Work, tempo <br />rary buildings, false work, and materials and <br />equipment in transit, and shall insure against at <br />least the following perils or causes of loss: fire, <br />forcement of Laws and Regulations, water <br />damage, and such other perils or causes of <br />3. include expenses incurrcd in the <br />repair or replacement of any insured property <br />{including but not limited to fees and charges of <br />engineers and architects); <br />cover materials and equipment <br />agreed to in writing by OWNER prior to being <br />incorporated in the Work, provided that such <br />materials and equipment have been included in <br />an Application for Payment recommended by <br />ENGINEER; <br />by O1v7�'T� R <br />6. include testing and startup; and <br />be maintained in effect until final pay <br />writing by OWNER, CONTRACTOR, and <br />ENGINEER with 30 days written notice to each <br />other additional -insured to whom a certificate of <br />insurance has been issued. <br />B. OWNER shall purchase and maintain such <br />insurance as may be required by the Supplementary <br />the <br />interests <br />of OWNER, CONTRACTOR, <br />tants, and any other individuals or entities identified in <br />the Supplementary Conditions, each of whom is <br />00700 - General Conditions REV 5-10-13 <br />00700 - 16 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1413 -Martin Luther King Walking TrailWdmin\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.