My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-102
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:21:22 PM
Creation date
7/23/2015 2:08:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/19/2015
Control Number
2015-102
Agenda Item Number
8.I.
Entity Name
Timothy Rose Contracting
Subject
Martin Luther King Walking Trail
Contract Documents
Area
45th Street and 28th Court
Project Number
1413
Bid Number
2015034
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. If the proper execution or results of any part of <br />CONTRACTOR's Work depends upon work per- <br />formed by others under this Article 7, CONTRACTOR <br />shall inspect such other work and promptly report to <br />ENGINEER in writing any delays, defects, or deficien- <br />cies in such other work that render it unavailable or <br />unsuitable for the proper execution and results of <br />CONTRACTOR's Work. CONTRACTOR's failure to <br />so report will constitute an acceptance of such other <br />work as fit and proper for integration with <br />CONTRACTOR's Work except for latent defects and <br />deficiencies in such other work. <br />7.02 Coordination <br />A. If OWNER intends to contract with others for <br />the performance of other work on the Project at the <br />Site, the following will be set forth in Supplementary <br />Conditions: <br />1. the individual or entity who will have <br />authority and responsibility for coordination of <br />the activities among the various contractors will <br />be identified; <br />2. the specific matters to be covered by <br />such authority and responsibility will be <br />itemized; and <br />3. the extent of such authority and <br />responsibilities will be provided. <br />B. Unless otherwise provided in the <br />Supplementary Conditions, OWNER shall have sole <br />authority and responsibility for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations to CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, OWNER shall appoint an engineer to <br />whom CONTRACTOR makes no reasonable <br />objection, whose status under the Contract <br />Documents shall be that of the former ENGINEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data <br />required of OWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments to CONTRAC- <br />TOR promptly when they are due as provided in <br />paragraphs 14.02.0 and 14.07.C. <br />8.05 Lands and Easements; Reports and Tests <br />A. OWNER's duties in respect of providing lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in paragraphs <br />4.01 and 4.05. Paragraph 4.02 refers to OWNER's <br />identifying and making available to CONTRACTOR <br />copies of reports of explorations and tests of <br />subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the Site that <br />have been utilized by ENGINEER in preparing the <br />Contract Documents. <br />8.06 Insurance <br />A. OWNER's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance are set forth in Article 5. <br />8.07 Change Orders <br />A. OWNER is obligated to execute Change <br />Orders as indicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. OWNER's responsibility in respect to certain <br />inspections, tests, and approvals is set forth in <br />paragraph 13.03.B. <br />8.09 Limitations on OWNER's Responsibilities <br />A. The OWNER shall not supervise, direct, or <br />have control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, se- <br />quences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for any <br />failure of CONTRACTOR to comply with Laws and <br />Regulations applicable to the performance of the <br />Work. OWNER will not be responsible for <br />CONTRACTOR's failure to perform the Work in <br />accordance with the Contract Documents. <br />00700 - General Conditions REV 5-10-13 <br />00700 - 27 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1413-Martin Luther King Walking Trail Wdmin\bid documents\Master Contract Documents100700 - General Conditions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.