My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-095A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-095A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:34:14 AM
Creation date
7/24/2015 10:06:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/12/2015
Control Number
2015-095A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting
Subject
Intersection Improvements
Area
20th Ave. & 16th Street
Project Number
0225
Bid Number
2015037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACP in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />.. status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. If ENGINEER considers the Work <br />INV <br />WIN <br />Ulf <br />r <br />.A. <br />Completion which shall fix the date of Substantial <br />Completion. There shall be attached to the certificate <br />a tcntati <br />after receipt of the tentative certificate during which to <br />provisions of the certificate or attached list. If, after <br />des <br />Ily complete, <br />tentative certificate to OWNER notify CONTRACTOR <br />in writing, stating the reasons therefor. If, after <br />- - - e•'•� <br />considers the Work substantially complete, <br />ENGINEER will within said 14 days execute and <br />1 . <br />certificate of Substantial Completion (with a revised <br />any objections from OWNER. At the time of delivery <br />TOR a written recommendation as to division of <br />responsibilities pending final payment between <br />OWNER and CONTRACTOR with respect to security, <br />operation, safety, and protection of the Work, <br />and guarantees. Unless OWNER and <br />CONTRACTOR agree otherwise in writing and so <br />payment. <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow CON- <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the <br />Work. CONTRACTOR at any time may notify <br />OWNER and ENGINEER in writing that <br />CONTRACTOR <br />considers any such part of the <br />Work ready for its intended use and substan- <br />tially complete and request ENGINEER to issue <br />a certificate of Substantial Completion for that <br />part of the Work. Within a reasonable time <br />after either such request, OWNER, <br />CONTRACTOR, and ENGINEER shall make <br />an inspection of that part of the Work to <br />determine its status of completion. If <br />ENGINEER does not consider that part of the <br />Work to be substantially complete, ENGINEER <br />will notify OWNER and CONTRACTOR in <br />writing giving the reasons therefor. If <br />ENGINEER considers that part of the Work to <br />be substantially complete, the provisions of <br />paragraph 14.04 will apply with respect to <br />certification of Substantial Completion of that <br />part of the Work and the division of <br />responsibility in respect thereof and access <br />thereto. <br />2. No occupancy or separate operation <br />of part of the Work may occur prior to <br />00700 - General Conditions REV 5-10-13 <br />00700 - 41 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS10225 20th Ave end 16th St Intersection Improvement \Admim\bid documents\Master Contract Documents \00700 - General Conditions <br />REV 5-10-13. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.