Laserfiche WebLink
SECTION 01024 <br />FORCE ACCOUNT <br />1.1 General <br />CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br />necessary to perform additional work not covered on the Contract Drawings. <br />The force Account is intended as a contingency for unforeseen work. <br />,.. 1.1 PAYMENT <br />ISO <br />✓ <br />✓ INO <br />A. Lump sum amount for force account work is included in the bid schedule. <br />The value of force account work will be determined in accordance with Article <br />12 of the General Conditions. <br />+ + END OF SECTION + + <br />01024- 1 <br />F:APublic Works\ENGINEERING DIVISION PROJECTS\0225 20th Ave and 16th St Intersection Improvement\Admim\bid <br />documents\Master Contract Documents\01024 - Force Accountdoc <br />