SECTION 01610 <br />TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br />1.1 GENERAL <br />A. Make all arrangements for transportation, delivery and handling of equipment <br />and materials required for prosecution and completion of the Work. <br />B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br />to the site only during regular working hours. Shipments shall be addressed and <br />.. consigned to the proper party givedlng name of to OWNER except wherject, e otherwise dnumber irected. <br />Shipments shall not be delivered <br />C. If necessary to move stored materials and equipment during construction, <br />CONTRACTOR shall move or cause to be moved materials and equipment <br />without any additional compensation. <br />IMP <br />1.2 DELIVERY <br />A. Arrange deliveries of products in accord with construction schedules and in <br />ample time to facilitate inspection prior to installation. <br />B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br />accommodate the following: <br />1. Work of other contractors, or OWNER. <br />2. Limitations of storage space. <br />3. Availability of equipment and personnel for handling products. <br />4. OWNER'S use of premises. <br />C. Do not have products delivered to project site until related Shop Drawings have <br />been approved by the ENGINEER. <br />D. Do not have products delivered to site until required storage facilities have been <br />provided. <br />E. Have products delivered to site in manufacturer's original, unopened, labeled <br />containers. Keep ENGINEER informed of delivery of all equipment to be <br />incorporated in the Work. <br />01610-1 <br />r documents Master Contract Document 1016110 PROnsportat0on and Handling of Materials and Equipment.doc provement\Admim\bid <br />