My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-095A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-095A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 10:34:14 AM
Creation date
7/24/2015 10:06:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/12/2015
Control Number
2015-095A
Agenda Item Number
8.J.
Entity Name
Timothy Rose Contracting
Subject
Intersection Improvements
Area
20th Ave. & 16th Street
Project Number
0225
Bid Number
2015037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />,,,, manufacturer or the OWNER, until the system is no longer needed. If a water <br />quality violation occurs, immediately cease all work contributing to the water quality <br />violation and correct the problem. <br />- <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to <br />the Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation <br />and Maintenance: Installation and maintenance of all erosion and stormwater <br />pollution control devices, shall be by a State Certified erosion control subcontractor <br />who specializes in the installation and maintenance of such devices. After <br />installation, this specialty subcontractor shall maintain the erosion and stormwater <br />pollution control devices until in the ENGINEER's sole opinion, the devices are no <br />longer necessary (such time not to extend past the date the OWNER formally <br />accepts the project as complete). Before beginning construction, submit to Indian <br />River County for review and approval, a Stormwater Pollution Prevention Plan <br />(SWPPP), prepared by the certified erosion control subcontractor. Construction <br />shall not begin until the SWPPP has been approved by Indian River County. <br />Submit the approved SWPPP to the ENGINEER before beginning construction. <br />Include in the SWPPP, the "Contractor's Affidavit Regarding Erosion Control and <br />Treatment of Dewatering Water and Stormwater From the Construction Site" <br />(located at the end of this Section). <br />1.6 "POLLUTION" AND CERTAIN UNCONTESTABLE POLLUTION EVENTS <br />DEFINED <br />A. With respect to this Section and as may be further defined in paragraphs 1.6.B, <br />1.6.C, and 1.6.D, "pollution" is the presence in off-site waters of any substances, <br />contaminants, or manmade or human -induced impairment of off-site waters or <br />01025-6 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\0225 20th Ave and 16th St Intersection Improvement\Admim\bid <br />documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.