My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-105
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:43:23 PM
Creation date
7/24/2015 11:05:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
05/19/2015
Control Number
2015-105
Agenda Item Number
8.K.
Entity Name
Arcadis US Inc
Subject
Amendent No. 7
Engineering Services
Area
SR-60 and 43rd Avenue
Project Number
431759-1-4B/42/43/45-01
Alternate Name
Arcadis G&M Inc
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5-19-15 <br />8,((, <br />IMPROVEMENT OF THE INTERSECTION OF SR 60 & 43RD AVENUE °� DSS " f <br />PROFESSIONAL CIVIL ENGINEERING & STRUCTURAL ENGINEERING <br />SERVICES <br />AMENDMENT NO. 7 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br />SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. (fka ARCADIS G&M, Inc.), <br />Inc. AND INDIAN RIVER COUNTY, FLORIDA. <br />This is an amendment to the existing Engineering Services Agreement (AGREEMENT) dated <br />September 6, 2005 between ARCADIS US, Inc. (ENGINEER) and Indian River County <br />(COUNTY). This amendment addresses changes in "Section I — Project Limits and Description", <br />"Section III - Scope of Services", and "Section V - Compensation". <br />Amendment Description <br />This Amendment includes the following: <br />"SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate <br />the following: <br />Consultant services are required for the preparation of road design plans; bridge plans; permit <br />applications and utility relocations associated with the construction of SR 60 / 43rd Avenue <br />Intersection Improvements. <br />ARCADIS US, Inc., was contracted to design the widening of 43rd Avenue from 26th Street to <br />18th Street. The project was designed at the same time as the widening of 43rd Avenue from 18th <br />Street south to 8th Street, designed by Carter Associates, Inc. Both designs assumed that <br />construction would happen concurrently, so design of a transition from the new four lane <br />configuration to the existing two lane configuration was not necessary for either plan. In addition, <br />part of the stormwater drainage system for the ARCADIS design was to be directed south and <br />treated in the Carter design. It has been determined that the roadway widening and drainage <br />system south of 18th street (the Carter design) will not be constructed at this time and the plans <br />should be revised to provide for a transition from four lanes to two lanes. In addition, a new <br />drainage system design to accommodate the portion of the ARCADIS project that was directed <br />south into the Carter project is necessary. The design will consist of inlets and pipes to convey <br />runoff from 43rd Avenue to a new stormwater drainage pond. Hydraulic calculation will be <br />performed to size the pipe system and the stormwater drainage pond. The roadway plans and <br />profile sheets will be revised to show required improvements. <br />The FDOT has reviewed the previously submitted plans and has provided comments to the <br />COUNTY and ENGINEER. ENGINEER will revise the plans to address the FDOT's comments <br />and to update the plans to the current FDOT design standards. <br />The following plan sheets will be modified: <br />Page 1 of 6 <br />G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.