Laserfiche WebLink
BRIDGE DESIGN ASSOCIATES, INC. <br />43RD AVENUE BRIDGE OVER MAIN REUEF CANAL <br />March 13, 2015 <br />BDA PROJECT NO.: 05-509B <br />HOURLY BREAKDOWN OF SERVICES <br />EXHIBIT "A" <br />ACTIVITY <br />CHIEF <br />ENGINEER <br />PROJECT <br />MANAGER <br />PROJECT <br />ENGINEER <br />ENGINEER <br />INTERN <br />FIELO <br />REPTECHNICUW <br />,, I <br />CAO <br />. <br />TOTAL. <br />HOURS <br />BY <br />ACTIVITY <br />LABOR <br />COST <br />BY <br />ACTIVITY <br />5195.00 <br />5165.00 <br />�., <br />992.00 <br />�..�,.�..�,,..� <br />580.00 <br />573.00 <br />:93.00 <br />. Update Notes and Design Standards <br />4.0 <br />8.0 <br />4.0 <br />18 0 <br />51.846 00 <br />AASHTO Girder Analysis <br />4.0 <br />18.0 <br />8.0 <br />28 0 <br />52,956 00 <br />Bridge Load Rating <br />4.0 <br />40.0 <br />440 <br />54,42000 <br />0.0 <br />SO 00 <br />0.0 <br />50 CO <br />..F <br />TOTAL MANHOURS <br />0.0 <br />12.0 <br />84.0 <br />0.0 <br />0.0 <br />12.0 <br />86.0 <br />oiRECT LABOR COST <br />50.00 <br />92,220.00 <br />55888.00 <br />50.00 <br />90.00 <br />51,116.00 <br />59,224.00 <br />ENGINEERING FEES <br />S 12005JOD11054i098 43rd Avenue et Mein Rebef Cana92O15101 AdmintPmposaislproposal 03.1315,x15 <br />59.224.00 <br />