Laserfiche WebLink
The following is a summary of costs: <br />Charge Associated with <br />This Amendment <br />Roadway Design <br />Geotechnical Services (Tierra) $5,447.50 <br />New Total <br />Compensation <br />$35,487.50 <br />Engineering $49,152.50 $312,797.03 <br />(ARCADIS) <br />Signal Plans $2,668.41 $31,488.41 <br />(SIMMONS & WHITE Inc.) <br />Stormwater Pollution Prevention Plans $0.00 <br />(ARCADIS) <br />$9, 022.92 <br />Permitting $11,760.00 $33,090.00 <br />(ARCADIS) <br />Surveying <br />Design Survey $1,089.20 $63,690.40 <br />(ARCADIS) <br />Right of Way Survey and Map $0.00 $20,386.40 <br />(ARCADIS) <br />Structural Design <br />Structural Design for SR 60 over <br />Main Relief Canal bridge $0.00 $76,060.00 <br />(Bridge Design Associates, Inc.) <br />Structural Design for 43rd Avenue over <br />Main Relief Canal bridge $9,224.00 $67,604.00 <br />(Bridge Design Associates, Inc.) <br />Landscape & Lighting Plans <br />Landscape Architectural Services <br />(Roy -Fisher Associates, Inc.) <br />Lighting Plans <br />(Techno Engineering) <br />$4,000.00 <br />$10, 750.00 <br />$31,486.00 <br />$39,835.00 <br />Page 4 of 6 <br />G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc <br />