Laserfiche WebLink
CARTER ( <br />C{)NStil,i'IN{1 l 11CrIItI_ AND I,A.NI) ',tile.\rLYOlt,`_r <br />21st "r t 1' V'ERO 111?i\CII. FLORIDA },g;•n•J 17, • 1/2-:;62-1191 77.'.•5(;2-7113n 1P,1N) <br />1011P1 II. 131,11M, P.L., PRINCIPAL <br />DAVID E.1.1.1E111.1E, P.S.h1., PRINCIPAL <br />GP.ORCIEA, SIMONS, Rls.,1'RINC:IPAL <br />PATRICK S. \VAL'I`Htilt, P.G., PRINCIPAL <br />p1ARVIN E. CARTEIt, P.S.M., Consttliani to tltc Pine <br />t)IsAN F. LIJL'1'HJIi, P.li, dt.s xO.Consullanl to Iltr firm <br />March 27, 2015 <br />Mr: Jason Fykes <br />Barth Construction, Inc. <br />1717 Indian River Blvd <br />Shite 202A <br />Vero Beach, Florida 32960 <br />RE: <br />Civil Engineering Services Agreement <br />IRC Fire Station #1 (Old Dixie Highway) <br />Addendum #1 _ Site Plan for Temporary Housing <br />Widening of Driveway onto Old Dixie Highway <br />Dear Jason: <br />112ANK S. 1 I1((91RLti1:, <br />1:1 1 .ii 1. I .\I111:S. 1'.P.. <br />S FINE'. 1), SNC)liE1?O1.1t, <br />Itl�ilI,A lli1), Sl l l I), I'.li. <br />We are pleased to present this proposed agreement to provide civil engineering services relative <br />to the above referenced project. The following describes our proposed scope of wort: and terms <br />of agreement between Carter Associates, Inc. (CAI) and Barth Construction, In. (CLIENT): <br />CAI services will include the following: <br />® Prepare a dimensional site plan showing the location of the temporary trailer meeting the <br />requirements of the City of Vero Beach with associated site data. <br />• Depict utility connections for water, sewer, and electric. <br />• Prepare applications and submit to City of Vero Beach for Minor Site Plan approval. <br />o Design widening of driveway onto Old Dixie Highway to accommodate existing fire and <br />medical service vehicles. <br />O Submit right-of-way permit to Indian River County for driveway modifications. <br />The above referenced tasks can be performed not to exceed the estimated amount of <br />$3,950.00. If additional services arc required outside this scope, then separate <br />authorization will be required. <br />Assumptions <br />CAI represents to the CLIENT that in developing this Scope of Work, assumptions have been <br />made, and that deviation from assumptions identified within this proposal may require additional <br />N:UHB\PROPOSAUBadh•FireStation1-Addendurn,doc Page 1 of 3 <br />©2014 by CAI <br />Sciv ntJ; 1•Ioncl,l <br />l l :iil Ic(. 0l1 <br />