XR15021
<br />RULE 'COPY
<br />:;ERRTIFIC,\TtIJN ON LASTPAGE
<br />I.R. SMITH. CLERK
<br />Table 4
<br />MAY 2015 BUDGET ESTIMATE
<br />SOUTH GIFFORD ROAD LANDFILL
<br />PHASE 4: Semi -Annual Sampling Activities
<br />Notes:
<br />I. Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa,gov).
<br />2. Groundwater Sampling Kit includes two sets of the following: water level indicator, peristaltic pump, water quality meter (pH,
<br />temperature, conductivity, dissolved oxygen, and oxidation reduction potential), turbidity meter, tubing, and miscellaneous field supplie
<br />3. Water Level Measurement Kit includes: water level indicator and miscellaneous field supplies.
<br />4. PDB Deployment Kit includes; miscellaneous field supplies necessary to suspend and deploy PDBs.
<br />Geosyntec Consultants
<br />ITEM
<br />BASIS
<br />RATE
<br />QUANTITY
<br />ESTIMATED
<br />BUDGET
<br />'
<br />• r'oj .0.0,$� yx tp
<br />D.u. r�.a_.a� ,. t
<br />tali v,.
<br />t
<br />g
<br />�;
<br />€.:, :.�•;.
<br />Senior Project Geologist
<br />hr
<br />$182
<br />4
<br />$728
<br />Geologist
<br />hr
<br />$130
<br />24
<br />$3,120
<br />Senior Staff Geologist
<br />hr
<br />$115
<br />132
<br />$15,180
<br />Subtotal Professional Services
<br />$19,028
<br />pp ! j � 'v �2 . R , f .k7
<br />r)IQ7['llllratt 5 Yv�C . .. '
<br />.. ., ht'JS'i
<br />qY,�'$t
<br />.,. rdr£�.'S"
<br />fi.1..-r-utti`.!�Er.,`:
<br />1
<br />%�,t
<br />Field Superintendent
<br />hr
<br />$115
<br />144
<br />$16,560
<br />Administrative Assistant
<br />hr
<br />$91
<br />2
<br />$182
<br />Subtotal Technical/Administrative Services
<br />$16,742
<br />�y
<br />u VU4,09l
<br />'.
<br />,
<br />�4 :�v«.-*n
<br />Laboratory Analysis for VOCs
<br />each
<br />$73
<br />87
<br />$6,330
<br />Laboratory Analysis for TOC
<br />each
<br />$27
<br />3
<br />$80
<br />Laboratory Analysis for Dissolved Gases
<br />each
<br />$64
<br />5
<br />$321
<br />Laboratory Analysis for Dhc
<br />each
<br />$305
<br />2
<br />$610
<br />Laboratory Analysis for vcrA
<br />each
<br />$144
<br />2
<br />$289
<br />Subtotal Subcontractor Services
<br />$7,630
<br />'+'se`-'1 ai.i'�a, J`; . a d tN kC
<br />P I2e�lii( u1's �ilt iN _' x r_ `� t ..p S �
<br />lb,
<br />j� f
<br />m .i i?.
<br />x �41r �'1��
<br />_.
<br />w
<br />�`'fi` �F
<br />�S .k.,;. ,s .x
<br />PDBs
<br />quote
<br />$2,235
<br />1
<br />$2,235
<br />PDBs Reusable Supplies/Shipping
<br />LS
<br />$127
<br />1
<br />$127
<br />Drums
<br />each
<br />$50
<br />2
<br />$100
<br />Drum Transport
<br />each
<br />$963
<br />2
<br />$1,926
<br />Lodging
<br />day
<br />$101
<br />18
<br />$1,818
<br />Per Diem
<br />day
<br />$51
<br />18
<br />$918
<br />Communications Fee
<br />3% labor
<br />0.03
<br />$35,770
<br />$1,073
<br />Field Vehicle
<br />day
<br />$97
<br />20
<br />$1,940
<br />8.5"x11" Photocopies
<br />each
<br />$0.12
<br />160
<br />$19
<br />Overnight Cooler
<br />each
<br />$95
<br />2
<br />$190
<br />Groundwater Sampling Kit
<br />day
<br />$275
<br />10
<br />$2,750
<br />Water Level Measurement Kit (2 person team)
<br />day
<br />$55
<br />4
<br />$220
<br />PDB Deployment Kit
<br />day
<br />$100
<br />2
<br />$200
<br />Equipment Shipping
<br />each
<br />$54
<br />2
<br />$108
<br />Subtotal Reimbursables
<br />$13,624
<br />kkn•)
<br />. .+. �
<br />�W'',V " JL5 Af."...0440
<br />_ ,b
<br />Notes:
<br />I. Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa,gov).
<br />2. Groundwater Sampling Kit includes two sets of the following: water level indicator, peristaltic pump, water quality meter (pH,
<br />temperature, conductivity, dissolved oxygen, and oxidation reduction potential), turbidity meter, tubing, and miscellaneous field supplie
<br />3. Water Level Measurement Kit includes: water level indicator and miscellaneous field supplies.
<br />4. PDB Deployment Kit includes; miscellaneous field supplies necessary to suspend and deploy PDBs.
<br />Geosyntec Consultants
<br />
|