Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />8 May 2015 <br />Page 2 <br />Geosyntec G' <br />consultants <br />The on -Site IP&T system was installed to provide hydraulic containment of the high <br />concentration area of the dissolved groundwater plume in December 2002. A Remedial Action <br />Plan (RAP) was developed in July 2003, concurrent with the groundwater monitoring activities <br />and IP&T system operation. The RAP outlined a proposed remedy for the VOC-impacted area of <br />the Site, including (but not limited to), expansion of the existing IP&T system and construction <br />of an infiltration gallery for effluent re-injection, which was completed in 2004. The infiltration <br />gallery was retrofitted in 2008, in accordance with design specifications described in the May <br />2007 RAP Modification document, and is currently being used as part of the biobarrier transect 1 <br />at the Site. The FDEP approved discontinuing the use of the IP&T system in a letter dated 2 <br />August 2006, provided the system shutdown coincided with the approval and implementation of <br />a Remedial Action Plan Modification (RAPM). A RAPM was submitted in May 2007 and <br />approved by FDEP in August 2007. Geosyntec discontinued IP&T system operation and <br />implemented the RAPM activities in April through June 2008. In July 2014, after approval by <br />FDEP, Geosyntec dismantled the IP&T system and transported the waste off-site for proper <br />disposal. In response to the recommendation by Geosyntec, FDEP approved use of a simplified <br />semi-annual report format in the future in email correspondence dated 26 September 2014. <br />PROPOSED SCOPE OF WORK <br />The proposed scope of work consists of semi-annual groundwater monitoring and reporting and <br />related activities to be performed on behalf of IRC SWDD at the Former South Gifford Road <br />Landfill. For the purpose of budgeting, the scope of work has been divided into the following <br />tasks: <br />• Task 1 — Project Management; <br />• Task 2 — Meetings/Regulatory Interaction; <br />• Task 3 — Annual Pollution Remediation Liabilities Evaluation; <br />• Task 4 — Semi -Annual Sampling Activities; and <br />• Task 5 — Data Evaluation and Semi -Annual Reporting. <br />The remainder of this section presents a general description of the activities to be performed in <br />each task. <br />Task 1 — Project Management: Under this task, Geosyntec will perform project planning and <br />management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice <br />review, project coordination, and project administration. The budget includes two hours per <br />month for the project manager over a 1 2 -month project duration and one hour per sampling/field <br />event has been included for the principal -in -charge. <br />XR 15143\XR 15021 <br />engineers 1 scientists 1 innovators <br />