My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-110
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 1:44:55 PM
Creation date
7/24/2015 1:32:49 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/19/2015
Control Number
2015-110
Agenda Item Number
15.B.3.
Entity Name
Geosyntec Inc.
Subject
Work Order Number 2
Area
South Gifford Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />8 May 2015 <br />Page 5 <br />ATRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, C .rfK <br />Geosyntec <br />consultants <br />The draft annual and semi-annual reports will be submitted to IRC SWDD for review prior to <br />submittal to FDEP. Each final semi-annual report will be signed and sealed by a Florida <br />registered professional engineer or geologist. <br />In addition, budget has been included to update the electronic database that is maintained for the <br />Site. The current database contains over 15 years of data from site assessment, remediation, and <br />redevelopment activities and the format is antiquated. Geosyntec proposes to migrate the <br />database to a new Database Management System (DMS). By managing the data in this manner, <br />the reporting effort related to table and figure preparation will be significantly more efficient and <br />will provide long-term cost savings. <br />SCHEDULE <br />Geosyntec will conduct the groundwater monitoring and reporting activities on a semi-annual <br />basis as described herein. The semi-annual groundwater monitoring events will be tentatively <br />conducted in June and December 2015. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks 1 through 5 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment A. <br />The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br />project requirements, our experience gained from executing similar tasks for SWDD since 2002 <br />at the Site, and experience with groundwater monitoring and reporting activities at similar <br />facilities. Geosyntec will not exceed the budget estimate without prior approval and written <br />authorization from IRC SWDD. <br />Task 1 — Project Management $6,075 <br />Task 2 — Meetings/Regulatory Interaction $5,249 <br />Task 3 — Annual Pollution Remediation Liabilities Evaluation $3,712 <br />Task 4 — Semi -Annual Sampling Activities $57,025 <br />Task 5 — Data Evaluation and Semi -Annual Reporting $20,415 <br />TOTAL 592,476 <br />XRI5143\XR15021 <br />engineers 1 scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.