Laserfiche WebLink
Exhibit A <br />Continuing Contract Agreement <br />Work Order No. 2 <br />Scope of Work <br />Indian River County Utility Services <br />West Regional WWTP 2015/2016 PERMIT RENEWAL <br />The current Indian River County IRCUD/West Regional WWTF Wastewater Facility - <br />Permit No. FL0041637 will be expiring on April 11, 2016. The renewal application will be <br />due on or before October 11, 2015. Failure to submit the application 180 days prior to <br />the expiration date of the referenced permit will result in enforcement action. Atkins has <br />contacted FDEP regarding the renewal of permit for the referenced facility and they have <br />indicated that the following forms and/or information will be required: <br />1. FDEP Form 1 <br />2. FDEP Form 2A <br />3. O&M Performance Report <br />4. Process Flow Diagram <br />5. Site Plan <br />6. Location Map <br />7. Binding Agreements and Documentation of Controls on Individual Users of <br />Reclaimed Water <br />8. Reclaimed Water or Effluent Analysis Report <br />9. Since the current flows to the WWTP are below 50% of the design capacity, <br />according to rule 62-600.405(4)(C) a capacity analysis report is in not required, <br />however based on discussion with FDEP, they would require a certified <br />statement to this effect. ATKINS will address this either in the signed and sealed <br />cover letter or in the O&M performance report. <br />Based on the above ATKINS has prepared the following scope. Details of the data <br />requirements are attached in Attachment A. <br />Task 1 Project Kick off and Data Collection <br />Task 1 requires gathering the data and updating Form 1, Form 2A and the permitting <br />package. PBSJ will work directly with IRC and WRWTF staff to obtain the required data <br />and complete the required forms and reports. A Project Kickoff meeting must be held <br />with the Staff and will be combined with the O&M performance report inspection. <br />Task 2 Permitting Forms <br />Task 2 requires gathering the data and updating Form 1 and Form 2A as submitted for <br />the previous permit renewal. IRC will be required to complete or provide the following: <br />1. Section 3. A. Discharges to Surface Water, Items 12, 13, and 14. A detailed <br />explanation of the required information is attached in Attachment A. <br />2. Section 5. Industrial Pretreatment for each SIU or significant industrial users. <br />