Laserfiche WebLink
QUESTIONS AND RESPONSES: <br />QUESTION NO. 1 <br />Could we get a copy of the geotech report emailed to bidders for review or do we have to come to the <br />County offices to review? <br />ANSWER NO. 1 <br />There was no Geotechnical Report prepared for this project. The cleaning of the canal bottom and side <br />slopes will be included in Bid Item 110-1-1, Clearing and Grubbing. Page 00800-3 Supplementary <br />Conditions of the Contract Documents has been revised and is attached. <br />QUESTION NO. 2 <br />There will be a small amount of sidewalk replacement. Under which item would you like this included? <br />ANSWER NO. 2 <br />Plans have been modified to show removal of 30 LF of existing sidewalk. Cost for removal of existing <br />sidewalk is included in the Bid Item No. 110-1-1 Clearing and Grubbing. A new Bid Item 522-1 Concrete <br />Sidewalk (6" thick) is added to the Itemized Bid Schedule. Revised Plan Sheets 5 and 6 of 8 are attached. <br />Also Revised Itemized Bid Schedule, page 000310-3 is attached. <br />QUESTION NO. 3 <br />What is the last date that you would take questions for this project? <br />ANSWER NO. 3 <br />No questions will be addressed if received after Sunday, May 24, 2015. <br />ATTACHMENTS: <br />Revised Plan Sheets 5 and 6 of 8 <br />Revised ITEMIZED BID SCHEDULE, Section 310, page 00310-3, dated May 18, 2015 <br />Revised SUPPLEMENTARY CONDITIONS page 00800-3 <br />Page 2 of 3 <br />F. APublic Works'ENGINEERING DIVISION PROJECTS 11427 -45th St Canal Enclosure at 43rd Ave AAdmin AAddendum VAddendum No. 15-18-2015. doc <br />