Laserfiche WebLink
2. The CONSULTANT will compile, review and analyze the following data for its use as it relates to <br />stormwater model development described under Task 3. <br />a. Topographic data (1 -foot contour) for the study area. <br />b. Indian River County future land use data. <br />c. Hourly rainfall and annual evaporation records for up to three gages available from the <br />National Climatic Data Center (NCDC). <br />d. Available hourly stream flow and stage records for the United States Geologic Survey <br />(USGS) gage on the Sebastian River. <br />e. Existing minimum flows and levels (MFLs) determined by St. Johns River Water <br />Management District (SJRWMD) for the Sebastian River. <br />f. Available existing hydrologic or hydraulic (H/H) models (e.g., ICPR, HSPF) for areas <br />covering, adjacent to, or downstream of the SRID. <br />g. Indian River County Flood Insurance Study (FIS) and digital flood insurance rate maps <br />(DFIRMs). <br />Subtask 1.2 — Field Monitoring <br />The CONSULTANT will collect physical data for each canal (L, C, D and Bypass), as well as at the <br />downstream location (just south of County Road 512 bridge) where all 3 canals merge. The <br />CONSULTANT will subcontract with Carter and Associates, Inc. (CAI) who will perform the field <br />monitoring and collection of survey data to define the geometry for each of the lateral canals (one <br />cross-section at each of the four canals). CAI will also collect continuous stage data at each of the three <br />outfall structures controlling flow from the lateral canals. Additionally, velocity and elevation data for <br />Lateral D will also be measured as this is an un -controlled channel. These data will be collected over a <br />time period of approximately 4 to 6 months (to capture dry and wet season periods). CAI will also collect <br />rainfall data from a local rain gauge for the same time period. The CONSULTANT will perform <br />coordination with CAI throughout the monitoring duration. The CONSULTANT will review stage, <br />velocity, flow and rainfall data collected by CAI to confirm that it meets the thresholds of the monitoring <br />equipment and that it does not contain anomalies that may affect its validity for subsequent use in <br />surface water modeling (Task 3). The CONSULTANT will use the measurements (velocities, stages) <br />collected under Subtask 1.1 to calculate flow at each of the control structures and Lateral D. <br />Subtask 1.3 - Data Evaluation and Summary <br />To further support the modeling effort described in Task 3, the CONSULTANT will summarize the <br />available data provided by the OWNER, obtained from regulatory agencies, or collected in Task 1.1. The <br />CONSULTANT will evaluate the above data and summarize potential data gaps, recommendation for <br />data gap resolution, and the data that will be incorporated. The CONSULTANT will prepare a summary of <br />results in a draft Report Section with supporting graphics and tables which will be provided to the <br />OWNER for review. Any additional data collection needs will be negotiated under separate cover and <br />are not included in this Scope of Services or corresponding budget estimate. <br />TASK 2 - FIELD RECONNAISSANCE/RESOURCE ASSESSMENT <br />The CONSULTANT will supply two personnel to complete a limited one -day field review of the canal <br />system (specifically in the vicinity of the cross sections/data collection locations) to observe existing <br />conditions. The CONSULTANT will rely on existing information (Task 1) to the extent possible, but may <br />use additional observations made at the site to supplement information already documented. The <br />CONSULTANT will take photographs and document the results of the field review in a draft Report <br />Section. The OWNER will assist the CONSULTANT, if needed, with obtaining access to the site from SRID <br />in order to conduct the field review. The CONSULTANT will also set up a teleconference with SJRWMD to <br />s°miith <br />A-2 <br />jj1646_Exhibit A.docx <br />