My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.07 as it may be adjusted from time to time as <br />provided below. <br />1. CONTRACTOR shall submit to <br />ENGINEER for acceptance (to the extent indi- <br />cated in paragraph 2.07) proposed adjustments <br />in the progress schedule that will not result in <br />changing the Contract Times (or Milestones). <br />Such adjustments will conform generally to the <br />progress schedule then in effect and additional- <br />ly will comply with any provisions of the General <br />Requirements applicable thereto. <br />2. Proposed adjustments in the <br />progress schedule that will change the Contract <br />Times (or Milestones) shall be submitted in <br />accordance with the requirements of Article 12. <br />Such adjustments may only be made by a <br />Change Order or Written Amendment in accor- <br />dance with Article 12. <br />6.05 Substitutes and "Or -Equals" <br />A. Whenever an item of material or equipment is <br />specified or described in the Contract Documents by <br />using the name of a proprietary item or the name of a <br />particular Supplier, the specification or description is <br />intended to establish the type, function, appearance, <br />and quality required. Unless the specification or <br />description contains or is followed by words reading <br />that no like, equivalent, or "or -equal" item or no <br />substitution is permitted, other items of material or <br />equipment or material or equipment of other Suppliers <br />may be submitted to ENGINEER for review under the <br />circumstances described below. <br />1. "Or -Equal" Items: If in ENGINEER's <br />sole discretion an item of material or equipment <br />proposed by CONTRACTOR is functionally <br />equal to that named and sufficiently similar so <br />that no change in related Work will be required, <br />it may be considered by ENGINEER as an <br />"or -equal" item, in which case review and <br />approval of the proposed item may, in <br />ENGINEER's sole discretion, be accomplished <br />without compliance with some or all of the <br />requirements for approval of proposed substi- <br />tute items. For the purposes of this paragraph <br />6.05.A.1, a proposed item of material or <br />equipment will be considered functionally equal <br />to an item so named if: <br />a. in the exercise of reasonable <br />judgment ENGINEER determines that: (i) it <br />is at least equal in quality, durability, <br />appearance, strength, and design <br />characteristics; (ii) it will reliably perform at <br />least equally well the function imposed by <br />the design concept of the completed Project <br />as a functioning whole, and; <br />b. CONTRACTOR certifies that: (i) <br />there is no increase in cost to the OWNER; <br />and (ii) it will conform substantially, even <br />with deviations, to the detailed requirements <br />of the item named in the Contract <br />Documents. <br />Substitute Items <br />a. If in ENGINEER's sole discretion an <br />item of material or equipment proposed by <br />CONTRACTOR does not qualify as an <br />"or -equal" item under paragraph 6.05.A.1, it <br />will be considered a proposed substitute <br />item. <br />b. CONTRACTOR shall submit suffi- <br />cient information as provided below to allow <br />ENGINEER to determine that the item of <br />material or equipment proposed is <br />essentially equivalent to that named and an <br />acceptable substitute therefor. Requests for <br />review of proposed substitute items of <br />material or equipment will not be accepted <br />by ENGINEER from anyone other than <br />CONTRACTOR. <br />c. The procedure for review by ENGI- <br />NEER will be as set forth in paragraph <br />6.05.A.2.d, as supplemented in the General <br />Requirements and as ENGINEER may <br />decide is appropriate under the <br />circumstances. <br />d. CONTRACTOR shall first make <br />written application to ENGINEER for review <br />of a proposed substitute item of material or <br />equipment that CONTRACTOR seeks to <br />furnish or use. The application shall certify <br />that the proposed substitute item will <br />perform adequately the functions and <br />achieve the results called for by the general <br />design, be similar in substance to that <br />specified, and be suited to the same use as <br />that specified. The application will state the <br />extent, if any, to which the use of the pro- <br />posed substitute item will prejudice <br />CONTRACTOR's achievement of Substan- <br />tial Completion on time, whether or not use <br />of the proposed substitute item in the Work <br />will require a change in any of the Contract <br />Documents (or in the provisions of any other <br />direct contract with OWNER for work on the <br />Project) to adapt the design to the proposed <br />substitute item and whether or not <br />incorporation or use of the proposed substi- <br />tute item in connection with the Work is sub- <br />ject to payment of any license fee or royalty. <br />All variations of the proposed substitute <br />00700 - General Conditions REV 5-10-13 <br />00700 - 19 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 45th St Beautification Wdmin\bid documents\Master Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.