My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to submit additional or more accurate data in support <br />of such Claim, dispute, or other matter). A Claim for <br />an adjustment in Contract Price shall be prepared in <br />accordance with the provisions of paragraph 12.01.B. <br />A Claim for an adjustment in Contract Time shall be <br />prepared in accordance with the provisions of <br />paragraph 12.02.B. Each Claim shall be accom- <br />panied by claimant's written statement that the adjust- <br />ment claimed is the entire adjustment to which the <br />claimant believes it is entitled as a result of said event. <br />The opposing party shall submit any response to <br />ENGINEER and the claimant within 30 days after <br />receipt of the claimant's last submittal (unless <br />ENGINEER allows additional time). <br />B. ENGINEER's Decision: ENGINEER will <br />render a formal decision in writing within 30 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. ENGINEER's <br />written decision on such Claim, dispute, or other <br />matter will be final and binding upon OWNER and <br />CONTRACTOR unless: <br />1. an appeal from ENGINEER's <br />decision is taken within the time limits and in <br />accordance with the dispute resolution <br />procedures set forth in Article 16; or <br />2. if no such dispute resolution <br />procedures have been set forth in Article 16, a <br />written notice of intention to appeal from <br />ENGINEER's written decision is delivered by <br />OWNER or CONTRACTOR to the other and to <br />ENGINEER within 30 days after the date of <br />such decision, and a formal proceeding is <br />instituted by the appealing party in a forum of <br />competent jurisdiction within 60 days after the <br />date of such decision or within 60 days after <br />Substantial Completion, whichever is later <br />(unless otherwise agreed in writing by OWNER <br />and CONTRACTOR), to exercise such rights or <br />remedies as the appealing party may have with <br />respect to such Claim, dispute, or other matter <br />in accordance with applicable Laws and <br />Regulations. <br />C. If ENGINEER does not render a formal <br />decision in writing within the time stated in paragraph <br />10.05.B, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing by OWNER, such costs shall be in amounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following items, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.B. <br />1. Payroll costs for employees in the <br />direct employ of CONTRACTOR in the perfor <br />mance of the Work under schedules of job <br />classifications agreed upon by OWNER and <br />CONTRACTOR. Such employees shall include <br />without limitation superintendents, foremen, <br />and other personnel employed full time at the <br />Site. Payroll costs for employees not employed <br />full time on the Work shall be apportioned on <br />Payroll costs shall include, but not be limited to, <br />salaries and wages plus the cost of fringe <br />benefits, which shall include social security <br />and retirement benefits, bonuses, sick I ove, <br />vacation and holiday pay applicable thereto. <br />legal holidays, shall be included in the above to <br />the extent authorized by OWNER. <br />2. Cost of all materials and equipment <br />furnished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to make payments, in which case the cash <br />discounts shall accrue to OWNER. All trade <br />discounts, rebates and refunds and returns <br />from sale of surplus materials and equipment <br />shall accrue to OWNER, and CONTRACTOR <br />shall make provisions so that they may be <br />obtained. <br />00700 - General Conditions REV 5-10-13 <br />00700 - 30 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 45th St BeautificationWdmin\bid documents\Master Contract Documents\00700 - General Conditions <br />REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.