My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br />A. The CONTRACTOR shall be responsible for and make good all damage to <br />pavement beyond the limits of this Contract, buildings, telephone or other <br />cables, water pipes, sanitary pipes, or other structures which may be <br />encountered, whether or not shown on the Drawings. <br />B. Information shown on the Drawings as to the location of existing utilities has <br />been prepared from the most reliable data available to the Engineer. This <br />information is not guaranteed, however, and it shall be this CONTRACTOR's <br />responsibility to determine the location, character and depth of any existing <br />utilities. He shall assist the utility companies, by every means possible to <br />determine said locations. Extreme caution shall be exercised to eliminate any <br />possibility of any damage to utilities resulting from his activities. <br />1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br />A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br />boxes, inlets and similar structures in the areas of construction that are to <br />remain in service shall be adjusted by the CONTRACTOR to bring them flush <br />with the surface of the finished work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to <br />the various utility companies. <br />+ + END OF SECTION + + <br />01541-5 F:\PublicWorks\ENGINEERING DIVISION <br />PROJECTS\1506-Gifford Neighborhood 45th St Beautification\Admin\bid documents\Master Contract <br />Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.