My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION - 102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction (2014 Edition), <br />except as modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section <br />consists of maintaining traffic within the limits of the project for the duration of the <br />construction period, including any temporary suspensions of the work. It shall <br />include the construction and maintenance of any necessary detour facilities; the <br />providing of necessary facilities for access to residences, businesses, etc., along <br />the project; the furnishing, installing and maintaining of traffic control and safety <br />devices during construction, the control of dust through the use of calcium chloride if <br />necessary, and any other special requirements for safe and expeditious movement <br />of traffic as may be called for on the plans. The term, Maintenance of Traffic, as <br />used herein, shall include all of such facilities, devices and operations as are <br />required for the safety and convenience of the public as well as for minimizing public <br />nuisance; all as specified in this Itemized Section 14 of these provisions and <br />Paragraph 24 in General Conditions Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br />present his Maintenance of Traffic Plan at the pre -construction conference. The <br />Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br />barricades, striping and barriers to be used for the safe passage of pedestrians and <br />vehicular traffic through the project and for the protection of the workmen. The plan <br />will indicate conditions and setups for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />1lQu 1 l G JIQu specified. peUIICd. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of <br />Traffic Plan that become necessary shall also be approved in writing. Except in an <br />emergency, no changes to the approved plan will be allowed until approval to <br />change such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included in <br />the pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on <br />the project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />schedule of these inspections and be given the opportunity to join in the inspection <br />as is deemed necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />01025-2 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1506 -Gifford Neighborhood 45th St BeautificationWdmin\bid <br />documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.