Laserfiche WebLink
retain all washwater on-site. Do not use limerock. <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Crushed limerock shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually granite), <br />washed and meeting the requirements of FDOT Standard Specifications for <br />Road and Bridge Construction, Section 901. <br />Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br />C. Immediately clean all dirt and debris from pipes and drainage structures, and repair <br />all flooding, washouts, and other erosion damage to the Work, regardless of the <br />state of completion of the Work, and until the Work is accepted by the OWNER, at <br />no cost to the OWNER. This includes damage caused by erosion of any kind (e.g. <br />wind, waves, stormwater runoff, etc. Restore all erosion damaged areas to design <br />grades. Also, refer to General Conditions 6.13.B. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Prevention, Control & Abatement of Erosion & Water Pollution <br />- Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-10 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 45th St Beautification\Admin\bid <br />documents\Master Contract Documents\Technical Specifications.doc <br />