My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mulching: Use of cypress mulch is prohibited. <br />D. Installation: All materials must be available for inspection before installation and will be <br />subject to approval or rejection. Mark proposed mowing limits, planting beds and <br />individual locations of trees and palms as shown in the Contract Documents for the <br />Engineer's review, prior to excavation or planting. Trees, palms, and understory trees <br />may be relocated within the project limits as directed by the County Engineer. There <br />shall be no additional cost to the County if relocation is directed. Make no changes to <br />the layout, materials or any variations of plant materials from the Contract Documents <br />without the Engineer's written approval. <br />E. Planting: Meet the requirements of the FDOT Design Standards, Index No. 544. <br />F Soil Drainage: All planting holes and beds must drain sufficiently prior to installing <br />any plants. Immediately notify the Engineer of drainage or percolation problems <br />before plant installation. <br />G. Establishment periods are defined as one year after installation of all small plants and <br />incidental landscaping and two years after installation of all large plants. Provide the <br />Engineer with seven calendar days advance notice of completing installation of all <br />small and large plants. The establishment period will begin upon acceptance of the <br />complete installation of small and large plants respectively, by the Engineer. Upon <br />completion of installation of small and large plants, the Responsible Party shall certify <br />on a form provided by the Owner that the landscaping has been installed and is being <br />established in accordance with the Contract Documents. <br />During the establishment period: Keep al! plants undamaged, watered, fertilized, <br />mulched, pruned, and staked and guyed as necessary to assure specified minimum <br />grade of Florida No. 1. Keep the individual plant locations and planting beds free of <br />litter and undesirable vegetation. Keep landscape bed lines correctly located and <br />edged, and the mulch groomed and replenished. Operate and maintain all components <br />of any irrigation system installed as part of the Contract Documents. Continue any <br />mowing of the landscape areas specified in the Contract. <br />H Remedial Work: The Responsible Party shall perform all necessary remedial work at no <br />cost to the n ner. Use replacement plants of the same species and panting medium <br />as the plant being replaced and as specified in the Contract Documents. Replacement <br />plant size must match the size of the adjacent grown -in plants of the same species and <br />variety which may be larger than the initially installed size. Approval of remedial work <br />does not relieve the Responsible Party from continuing responsibility under the <br />provisions of this Section. Upon completion of the establishment period, the Engineer <br />will release the Responsible Party from further remedial work and responsibility <br />provided all plants meet the requirements set forth in the Contract Documents and all <br />previous remedial work, if any, has been completed to the satisfaction of the Engineer. <br />Remove staking and guying from all plants. <br />01025-29 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1506 -Gifford Neighborhood 45th St Beautification\Admin\bid documents\Master <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.