Laserfiche WebLink
ITEMIZED BID SCHEDULE <br />PROJECT NAME:45th STREET BEAUTIFICATION PROJECT <br />BIDDER'S NAME: SUNSHINE LAND DE1506/2015040 <br />* ADDENDUM #1 JUNE 10, 2015 <br />TOTAL PROJECT BID AMOUNT (IN WORDS): <br />ONE MILLION THREE HUNDRED SIX THOUSAND EIGHT HUNDRED SEVENTY TWO DOLLARS & FIFTY NINE CENTS <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton CY = Cubic Yards SF = Square Feet <br />F:'Public Works\ENGINEERING DIVISION PROJECTS1150&Gifford Neighborhood 45th St Beaulificalon1AdminVIDDENDUMS11506Ilemized Bid Schedule <br />00310-4 <br />-1-w*moumaltaixo <br />traantltjrsUmt <br />c:UnttPnce__MAmountx <br />711-11-125 <br />SOLID TRAFFIC STRIPE (24") (THERMOPLASTIC) (WHITE)_ <br />819 <br />LF <br />5.54 <br />-. <br />4,537.26 <br />711-11-151TRAFFIC <br />STRIPE (6") (2'-4' SKIP) (THERMOPLASTIC) (WHITE) <br />850 <br />LF <br />1'76 <br />1,496.00 <br />711-11-152 <br />TRAFFIC STRIPE (6") (6'-10' SKIP) (THERMOPLASTIC) (WHITE) <br />360 <br />LF <br />1.76 <br />633.60 <br />711-11-160A <br />THERMOPLASTIC (WHITE) (PAVEMENT MESSAGE) (BICYCLE) <br />Z6 <br />EA <br />236.78 <br />6,156.28 <br />711-11-160B <br />THERMOPLASTIC (WHITE) (PAVEMENT MESSAGE) (SCHOOL) <br />2 <br />EA <br />231.00 <br />462.00 <br />711-11-170 <br />THERMOPLASTIC (WHITE) (DIRECTIONAL ARROW) <br />25 <br />EA <br />87.78 <br />2,194.50 <br />711-11-221 <br />SOLID TRAFFIC STRIPE (6") (THERMOPLASTIC) (YELLOW) <br />6,932 <br />LF <br />1.10 <br />7,625.20 <br />711-11-224SOLID <br />TRAFFIC STRIPE (18") (THERMOPLASTIC) (YELLOW) <br />66 <br />LF <br />4.10 <br />270.60 <br />711-11-251TRAFFIC <br />STRIPE (6") (10'-30' SKIP) (THERMOPLASTIC) (YELLOW) <br />5,005 <br />LF <br />1.31 <br />6,556.55 <br />ROADWAY IMPROVEMENTS SUB TOTAL <br />1,180,672.59 <br />MISCELLANEOUS <br />801 <br />TRENCH SAFETY COMPLIANCE (OVER 5') (SEE SEC. 00454) <br />1 <br />LS <br />1 00.00 <br />1 00.00 <br />802 <br />TRENCH SAFETY COMPLIANCE (SHORING) (SEE SEC. 00454) <br />1 <br />LS <br />100.00 <br />100.00 <br />803 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />26,000.00 <br />26,000.00 <br />FA -1 <br />FORCE ACCOUNT <br />1 <br />LS <br />100,000.00 <br />100,000.00 <br />MISCELLANEOUS SUB TOTAL <br />126,200 <br />• OVERALL PROJECT TOTAL <br />1,306,872.59 <br />TOTAL PROJECT BID AMOUNT (IN WORDS): <br />ONE MILLION THREE HUNDRED SIX THOUSAND EIGHT HUNDRED SEVENTY TWO DOLLARS & FIFTY NINE CENTS <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton CY = Cubic Yards SF = Square Feet <br />F:'Public Works\ENGINEERING DIVISION PROJECTS1150&Gifford Neighborhood 45th St Beaulificalon1AdminVIDDENDUMS11506Ilemized Bid Schedule <br />00310-4 <br />