Laserfiche WebLink
SUMMARY_OF PAY ITEMS <br />ITEM NO. ITEM UNIT PROJEITYI <br />Q <br />O <br />A ret. <br />N r <br />O <br />< W <br />N <br />0 <br />r <br />N < <br />N <br />.— m <br />M N <br />0 <br />O <br />.- <br />r <br />NO <br />NOm <br />N VO <br />m00 <br />O <br />N <br />m N <br />N <br />m0 <br />m N <br />m 0 <br />0 <br />J J <br />J J <br />J J <br />0 0 <br />4) 0 <br />H -- <br />W W J <br />t) LL (1) <br />N <br />W W <br />J J <br />J J <br />J W <br />W J <br />J J <br />a <br />3 <br />0 <br />'1 <br />n <br />i <br />Maintenance of Traffic <br />Prevention, Control & Abatement of Erosion and Water Pollution <br />,22a <br />o c <br />g2 <br />U <br />U G <br />a <br />¢ 'n <br />'Aerial Photography (4 Panels/Flight Every 30 Days During Project) <br />11 Clearing 8 Grubbing <br />Excavation <br />Prepared Soil Layer (3") <br />Optional Base Group 14 <br />Milting Existing Asphalt Pavement (1") <br />Type SP -9.5 (Traffic C) (1") <br />Type SP -12.5 (Traffic C) (1.5") <br />Manhole (Adjust) <br />Valve Box (Adjust) <br />Conc. Curb and Gutter (Type F) <br />Sidewalk & Driveways (6' Thick) <br />Detectable blaming Domes <br />Performance Turf, Sod ahia �J <br />SIGNING AND MARKING <br />Si n Relocation <br />Retro -Reflective Pavement Markers <br />6' Thermoplastic White <br />12' Thermoplastic White <br />24" Thermoplastic White <br />6' Thermoplastic White (2,4' Skip) <br />6" Thermoplastic White (6'-10' Skip) <br />Thermoplastic White Pavement Message <br />Thermoplastic White Arrow <br />6' Thermoplastic Yellow <br />18" Thermoplastic Yellow <br />6" Thermoplastic Yellow (10-30 Skip) <br />rr—r <br />285-714 <br />327-70-1 <br />334-7-42 <br />334-7-43 <br />Oul tq.�- <br />NO <br />vh <br />N0 <br />Nv <br />570-1-2 <br />n <br />711-11-152 <br />711-11-160 <br />i:1 <br />PAY ITEM FOOTNOTES <br />N <br />M M <br />w U <br />4.1 <br />0 <br />