My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-128A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:13:30 PM
Creation date
7/29/2015 10:30:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/07/2015
Control Number
2015-128A
Agenda Item Number
8.C.
Entity Name
Sunshine Land Design Inc.
Subject
45th Street Beautification
Contract and Specifications
Area
Gifford 45th Street
Project Number
1506
Bid Number
2015040
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.07 Patent Fees and Royalties 21 <br />6.08 Permits <br />6.09 Laws and Regulations 21 <br />6.10 Taxes 21 <br />6.11 Use of Site and Other Areas 22 <br />6.12 Record Documents 22 <br />6.13 Safety and Protection 22 <br />6.14 Safety Representative 22 <br />23 <br />6.15 Hazard Communication Programs 23 <br />6.16 Emergencies 23 <br />6.17 Shop Drawings and Samples 23 <br />6.18 Continuing the Work 24 <br />6.19 CONTRACTOR's General Warranty and Guarantee 24 <br />6.20 Indemnification 25 <br />ARTICLE 7 - OTHER WORK <br />25 <br />7.01 Related Work at Site 25 <br />7.02 Coordination 26 <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES 26 <br />8.01 Communications to Contractor 26 <br />8.02 Replacement of ENGINEER 26 <br />8.03 Furnish Data 26 <br />8.04 Pay Promptly When Due 26 <br />8.05 Lands and Easements; Reports and Tests 26 <br />8.06 Insurance 27 <br />8.07 Change Orders 27 <br />8.08 Inspections, Tests, and Approvals 27 <br />8.09 Limitations on OWNER's Responsibilities 27 <br />8.10 Undisclosed Hazardous Environmental Condition 27 <br />8.11 Evidence of Financial Arrangements 27 <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION 27 <br />9.01 OWNER'S Representative 27 <br />9.02 Visits to Site 27 <br />9.03 Project Representative 27 <br />9.04 Clarifications and Interpretations 27 <br />9.05 Authorized Variations in Work 28 <br />9.06 Rejecting Defective Work 28 <br />9.07 Shop Drawings, Change Orders and Payments 28 <br />9.08 Determination for Unit Price Work 28 <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work 28 <br />9.10 Limitations on ENGINEER's Authority and Responsibilities 28 <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 29 <br />10.01 Authorized Changes in the Work 29 <br />10.02 Unauthorized Changes in the Work 29 <br />10.03 Execution of Change Orders 29 <br />10.04 Notification to Surety 29 <br />10.05 Claims and Disputes 29 <br />00700 - 3 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1506 -Gifford Neighborhood 45th St Beautification\Admin\bid documents\Master Contract Documents\00700 - General Conditions REV 5-10-13. doc <br />00700 - General Conditions REV 5-10-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.