My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/24/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
03/24/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 12:01:16 PM
Creation date
7/29/2015 1:12:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/24/2015
Meeting Body
Board of County Commissioners
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Round Island Riverside Park Improvements/Repairs <br />The Round Island Riverside Park observation/fishing pier is in substantial need of repair. A recent cost <br />estimate obtained from a qualified marine contractor indicates that repairs to the pier will cost <br />approximately $90,000. <br />Also in need of repair is the asphalt paving of the parking lot, boat ramp approach and access drive. The <br />total cost to rebuild the pavement base and repave the parking area, boat ramp approach, and access drive <br />is estimated to be approximately $188,000 (see Attachment 3). Of that amount, approximately $96,000, <br />for repaving of the boat ramp/trailer area, is eligible for use of Florida Boating Improvement Funds. The <br />remainder county match amount of $92,000 (i.e., the amount not covered by FIND grant funds or boating <br />improvement funds) would need to be funded by other means, such as Secondary Roads (Fund 109). <br />The following table provides a breakdown of estimated cost for the proposed Round Island Riverside <br />Park improvements by project elements: <br />Round Island Riverside Park Improvements FIND Waterways Assistance Program <br />Project <br />Project Elements <br />Estimated Cost <br />FIND Cost <br />County Cost <br />Replacement of observation/fishing <br />boardwalk (380 linear feet, 2600 square feet) <br />$90,000 <br />$90,000 <br />Boat ramp approach / boat trailer parking area, <br />rebuild base/ repave (±4800 sq. yds.) <br />$96,000 <br />$96,000 (FBIF) <br />Parking for kayakers and day users, rebuild <br />base/repave (2500 sq. yds.) <br />$50,000 <br />$50,000 (SRF) <br />Driveway access, rebuild base/repave (±2100 <br />sq. yds.) <br />$42,000 <br />$42,000 (SRF) <br />TOTAL <br />$278,000 <br />$90,000 <br />$188,000 <br />FBIF: Florida Boating Improvement Funds. SR: Secondary Roads Fund. <br />Archie Smith Fish House "Phase I" Dock Restoration <br />In 2014, Indian River County contracted an architectural and engineering firm (Atelier AEC) to develop <br />restoration design plans for the historic Archie Smith Fish House, using a State historic resources cost - <br />share grant. The restoration design project has been completed, and the County is now seeking grant <br />funding for the restoration work. <br />At staffs request, in October 2014, Atelier AEC provided staff with an estimate of probable cost for <br />restoration of the Archie Smith site main building, icehouse, and dock (see Attachment 2). Atelier's <br />estimated cost for the overall restoration is $880,806. For restoration of the dock (only), the estimated <br />cost is $535,500 (including fees and contingencies). Because of the substantial cost of the overall <br />restoration, staff suggests that the project be phased. Staff's proposal is that the County apply for "Phase <br />I" FIND grant funding under the current application cycle for the dock restoration component (only), <br />using Florida Boating Improvement Funds for the County's match. <br />The following table provides a breakdown of estimated cost for the proposed Archie Smith Fish House <br />Phase I Restoration by project elements: <br />2 <br />F:\Community Development\Users\ROLAND\LAAC\Archie Smith Fish House\FIND grant app BCC Res staff rpt for 3-24-15.rtf <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.