My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/24/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
03/24/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 12:01:16 PM
Creation date
7/29/2015 1:12:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/24/2015
Meeting Body
Board of County Commissioners
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL EXCEPTION SITE PLAN APPLICATION SUBMISSION CHECKLIST <br />MATERIAL (note N/A where applicable) YES <br />1. EVIDENCE OF PRE -APP CONFERENCE IF PROJECT OVER <br />20 UNITS OR 40,000 SQ. FT. NEW IMPERVIOUS SURFACE <br />rd. gie i y <br />2. Fee: Administrative Approval $200.00 <br />Minor $650.00 <br />Major <br />< or = 5 acres: <br />> 5 but < 10 acres: <br />= or > 10 acres: <br />$1000.00 <br />$1200.00 <br />$1400.00 <br />Special Exception Use fees required in addition to above site plan fees: <br />$975.00 less than 40 acres <br />$1075.00 40 - 100 acres <br />$1275.00 over 100 acres <br />+$ 50.00 for each additional 25 acres over 100 acres <br />3. Completed Application Form, and if pre -app conference already held, then <br />a pre -application conference discrepancy letter response or summary of <br />plan revisions <br />4. Ten (10) Copies of the Site Plan <br />5. Two (2) Sealed Site Surveys <br />6. Two (2) aerials of site with project overlaid, showing surrounding 200 feet <br />7. Two (2) Copies of the Owner's Deed <br />8. Letter of Authorization (if applicant is not owner) <br />9. One (1) Copy of the Drainage Report <br />10. Completed Tree Removal Permit Application OR Signed Exemption Form <br />OR Noted as will apply 10 days prior to site plan release <br />11. Completed Land Clearing Permit Application OR Signed Exemption Form <br />OR Noted as will apply 10 days prior to site plan release <br />12. Three (3) sets signed, conceptual floor plans and elevations prepared by architect <br />or engineer (when project is required by Florida law to have such architectural or <br />engineering drawings) <br />,z <br />13. Environmental Survey if all or portion of project in environmentally sensitive are <br />14. Concurrency Application or Acknowledgement Form t/ <br />15. Written statement and photograph of posted sign <br />(Needed if Planning & Zoning approval required) <br />1801 27th Street, Vero Beach FL 32960AiACHMENT <br />F:\Community Development\Users\CurDev\Applications\spse app only.rtf Revised January 2011 <br />1 <br />NO <br />5lak <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.