OPINION OF PROBABLE COST <br />I. BUILDING COSTS <br />A. Enclosed Building cost ** 1,000 SF @ $182.50/SF <br />B. Open/Covered Bldg. cost** 1,800 SF @ $87.50/SF <br />C. Covered Walkway! ** -SF @ $38.OWSF <br />D. Furniture and Equipment cost** 2,800 SF@ $10.00/SF <br />Sub -Total <br />II. SITE CONSTRUCTION COSTS <br />A. Total Cost (see separate spread sheet) <br />III. CONTINGENCY <br />A. 5% of building and site construction cost <br />III. PROFESSIONAL FEES <br />B. Engineering / Architecture — design and permitting <br />C. Cost estimating / Contract Admin./ Inspections / Procurement <br />D. FGBC Certification / Commissioning <br />Sub -Total <br />IV. ESTIMATE OF OTHER EXPENSES <br />A. Reimbursable costs (prints, copies, mail, fed ex, etc.)* <br />B. Site Development permit app. fees (see attached schedule)* <br />C. FGBC Certification Application Fee* <br />D. Building department permit application / review fees** <br />Sub -Total <br />V. OTHER COSTS <br />$182,500.00 <br />$157,500.00 <br />$171,800.00(Removed) <br />$ 28,000.00 <br />$ 368,000.00 <br />$566,711.75 <br />$46,735.59 <br />$ 82,420.00 <br />$ 34,400.00 <br />$ 23,750.00 <br />$140,570.00 <br />$ 7,700.00 <br />$ 5,880.00 <br />$ 1,400.00 <br />$ 4,000.00 (Estimate) <br />$ 18,980.00 <br />A. Water & Sewer Impact Fees and Connection Fees** $ 8,478.00 <br />B. COVB Electric Impact/Connection Fees** $ 4,777.50 <br />C. IRC Impact & SR60 Fair Share Interest Fee** $ 0.00 <br />D. FTA Admin. Fee** $ 25,000.00 <br />E. IRC Admin. Fees** TBD <br />Sub -Total $ 38,255.50 <br />Grand Total <br />** - ESTIMATED, COSTS TO BE PAID DIRECTLY BY IRC <br />* - ESTIMATED. ACTUAL COSTS TO BE PAID BY CONSULTANT <br />AND REIMBURSED BY IRC. <br />TBD: To be determined by others or at a later date when information is available. <br />$1,179,252.84 <br />97 <br />