My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
04/21/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:21:36 PM
Creation date
7/31/2015 10:12:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/21/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Number 5 <br />Item <br />5.1 Install submersible pump in existing well. $ 8,965.00 <br />See attached breakdown and backup. <br />5.2 Center Flume Tie-in Point Modification $ 2,896.03 <br />See attached breakdown. <br />5.3 Additional concrete pad at SRCPS $ 4,270.00 <br />See attached breakdown. <br />5.4 Fumish & install 316SS fasteners shown on C15A $ 359.10 <br />See attached breakdown and backup. <br />5.5 Fumish & install single vertical pipe support. $ 1,507.59 <br />See attached breakdown and backup. <br />5.6 Fumish & install add'I 6" well. $ 5,885.00 <br />See attached breakdown and backup. <br />5.7 Increase recycle water system pump suction line diameter $ 10,783.45 <br />See attached breakdown and backup. <br />5.8 Permit plan revision fee $ 50.00 <br />See attached backup. <br />5.9 Delete approx. 14.3cy of river quartz at CPS $ (1,760.88) <br />See attached breakdown and backup. <br />5.10 Delete approx. 72sy of filter fabric at CPS $ (117.53) <br />See attached breakdown and backup. <br />5.11 Delete approx. 53sy of asphalt pavement at CPS $ (789.47) <br />See attached breakdown. <br />5.12 Delete approx. 56sy limerock base at CPS $ (374.39) <br />See attached breakdown and backup. <br />5.13 Delete approx. 59sy subgrade at CPS $ (148.50) <br />See attached breakdown. <br />5.14 Add approx. 111f guardrail at CPS $ 251.90 <br />See attached breakdown and backup. <br />5.15 Add approx. 171 sy concrete at CPS $ 20,966.00 <br />See attached breakdown and backup. <br />5.16 Add'I landscaping events $ 12,650.00 <br />See attached breakdown and backup. <br />5.17 Modifications to control building for code compliance $ 5,418.60 <br />See attached breakdown and backup. <br />5.18 Delete Bid Item 3.7 in its entirety - Abandon RO Concentrate piping at $ (2,535.00) <br />South County RO Water Treatment Plant per Sheet OF1. <br />5.19 Remove and dispose of approx. 20.4 SY of deteriorated existing asphalt $ 578.89 <br />at the SRCPS. Part of existing asphalt driveway to the site from 27th <br />Ave. is buckling and failing. It will be replaced with concrete (item 5.15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.