My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
04/21/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:21:36 PM
Creation date
7/31/2015 10:12:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/21/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Item 5.1 <br />AMERICAN DRILLING SERVICES, INC. <br />405 SW 2ND STREET <br />OKEECHOBEE, FL. 34974 <br />(863) 763-3221 <br />October 1, 2014 <br />Dear Chris, <br />Thank you for allowing me to bid on pressurizing the existing 6" well. If you pressurize <br />this well it will be good for priming the new 7.5 hp Gorman -Rupp. Due to the larger <br />diameter wells and suction lines, priming can be difficult. The well can also be used by <br />the irrigation contractor to get the trees watered in for the first year. This well is good to <br />have, I would not recommend abandoning the well as long as you are able to find a <br />reasonable beneficial use for it. <br />We appreciate the opportunity to do business with you! <br />Sincerely, <br />Frank DeCarlo <br />Bid Goes As Follows; <br />1.) Install a 5hp submersible pump <br />2.) Install a 42 -gallon equivalent bladder tank <br />3.) Install a 2" cycle stop valve <br />4.) Install a 2" tee and gate valve for the irrigation connection <br />5.) Connect the system to the new 7.5 hp Gorman -Rupp pump for easy priming. <br />Total Price $5,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.