My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
04/21/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:21:36 PM
Creation date
7/31/2015 10:12:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/21/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Items 5.6 and 5.7 <br />AMERICAN DRILLING SERVICES, INC. <br />405 SW 2" STREET <br />OKEECHOBEE, FL. 34974 <br />(863) 763-3221 <br />November 13, 2014 <br />Dear Nichole, <br />The original proposal for the PC South Algal Nutrient Removal Facility was for (3) wells <br />tied into the pump, 50' spacing with a 4" suction pipe. The original contract price was <br />$28,649.19 <br />We will be adding a 4th well for an additional $5,000.00 <br />The suction line will be up -graded to 6" because of the wells being distanced 400' apart <br />instead of 50' apart. The original contract price for labor and materials on the suction line <br />was $10,399.19 and the price for up -grades is an additional $9,161.81, bringing the total <br />for labor and materials up to $19,561.00 <br />The price to install a 5hp submersible pump package to the system is $5,000.00 <br />The Revised Contract Price including all changes is $47,811.00 <br />Please sign and return if you agree to these terms. Feel free to contact me if you have any <br />questions. <br />Sincerely, <br />Frank DeCarlo <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.