My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
04/21/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:21:36 PM
Creation date
7/31/2015 10:12:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/21/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order Item 5.16 <br />From: fleaggjijsi <br />To: Nichole Amold <br />Cc: Keith McCully McCully <br />Subject: Osprey Marsh GKE Change Order <br />Date: Tuesday, December 23, 2014 3:00:13 PM <br />Attachments: jmage.ong <br />Nichole: <br />I spoke with Keith today regarding the above referenced subject. <br />As you and I discussed today on the phone, we originally anticipated completing this <br />project from start to finish in 30 days. We began the project during the first part of <br />October. Based on our discussion today, the project completion by Close <br />Construction and the turn over to the County will not take place until approximately <br />the end of January. With this additional 3 months and delays in planting added <br />significantly to our work schedule, we need to increase the watering events to 2 <br />times per week, or 24 additional events to carry us through the end of January. <br />This is dependent upon rainfall and turn over timeframe. Price for each watering <br />event will remain the same as $375 per event, which includes maintenance and <br />repairs. This is under item #5.02 "Irrigation and Watering". <br />In addition to this extended maintenance warranty period, we will need to complete <br />2 additional monthly exotic removal maintenance events. As we discussed today, <br />the original proposal that GKE signed with Close was for $405 per event for this <br />item, which is 6.02 "Exotic Elimination". Just prior to coming under contract with <br />Close, we were with the understanding that we would only be planting the northern <br />1/3 of the site and maintaining that until the balance of the project was completed. <br />The $450 only included the cost to maintain the northern 1/3 of the site. I <br />overlooked that line item at the time. The price for the entire site (10 acres) is <br />$1,250.00 per event, totaling an additional $2,500 for 2 additional events. The <br />additional watering events total is $9,000 for 24 events, which I do not believe that <br />number will be reached based on current conditions. <br />The total GKE requested change order is $11,500. <br />Please let me know if you have any questions. <br />Thanks again for your help. <br />George <br />George R. Kulczycki C.E.C., C.E.S. <br />G.K. Environmental, Inc. <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone: (772)567-9129 <br />Fax: (772)567-6245 <br />Email: gke.me.com <br />1:2, r <br />11 <br />• <br />4 <br />120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.