Laserfiche WebLink
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> The project includes the widening of Aviation Boulevard at 20' Avenue with turn lanes. The <br /> work will provide for roadway construction to include asphalt milling, asphalt placement, base, <br /> stabilized subgrade, drainage improvements, curb and gutter installation, signing and <br /> pavement markings. The project will also include a traffic signal at the intersection. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: Aviation Boulevard/20th Avenue Intersection Improvements <br /> County Project Number: 1422 <br /> Bid Number: 2014049 <br /> Project Address: Aviation Boulevard/20th Avenue Intersection, Vero Beach, <br /> Florida 32960 <br /> ARTICLE 3 — ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 180" day after the date when <br /> the Contract Times commence to run as provided in paragraph 2.03 of the General <br /> Conditions, and completed and ready for final payment in accordance with paragraph <br /> 00520-Agreement(Public Works)SAMPLE <br /> 00520-2 124 <br /> F.\Public Works\ENGINEERING DIVISION PROJECTS\1422 Aviation Blvd-20th Avenue Intersection Improvements\Admim\bid documents\Master Contract Documents\00520- <br /> Agreement(Public Works)SAMPLE doc <br />