My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/05/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
05/05/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 3:33:53 PM
Creation date
8/6/2015 2:11:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/05/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
416, <br /> Board of County Commissioners <br /> Administration-Building A <br /> 1801 27th Street <br /> Vero Beach,Florida 32960 <br /> Telephone: (772) 567-8000 FAX: 772-778-9391 <br /> Project: <br /> Indian River Boulevard Sidewalk — (37th Street to 53rd Street) <br /> Topographic Design Survey <br /> IRC Project No. 1415 <br /> WORK ORDER NO. 2 (Engineering/Surveying) <br /> FOR <br /> PROFESSIONAL SERVICES AGREEMENT <br /> ANNUAL SURVEYING and MAPPING SERVICES <br /> WITH <br /> Kimley-Horn and Associates, Inc. <br /> In accordance with Contract No. 1333 2014-2015 <br /> This Work Order No. 2 is in accordance with the existing AGREEMENT dated October 1, 2013, <br /> and renewed on October 17, 2014 between Kimley-Horn and Associates, Inc., (SURVEYOR) <br /> and Indian River County (COUNTY): <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No. 2 is for the SURVEYOR to perform all related field and office surveying <br /> and mapping services in connection with the preparation of a topographic design survey for <br /> sidewalk construction over a portion of Indian River Boulevard right-of-way. The survey will <br /> begin at the intersection of 37th Street and Indian River Boulevard and extend northerly along <br /> Indian River Boulevard to the intersection of Indian River Boulevard and 53rd Street. <br /> SECTION II -SCOPE OF SERVICES <br /> As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide <br /> Professional services to complete all tasks as outlined in this Work Order No. 2; specifically <br /> detailed in the attached proposal Exhibit A. <br /> SECTION III —TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br /> 1. Project shall be completed as follows: <br /> a. 100% "Paper" review submittal (final review prior to request for final deliverables) <br /> shall be made within 45 calendar days of receipt of Notice to Proceed for review by <br /> County Staff prior to preparing the final submittal package. <br /> b. Time of FINAL project completion shall be within 10 calendar days of receipt of the <br /> County's review comments from the 100% "Paper Submittal". <br /> C:\Users\chris.demeter\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\62YG17EF\IRC Kimhey Horn WO No 2 142 <br /> 04-09-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.