Laserfiche WebLink
EXHIBIT "A" <br /> AGREEMENT FOR PROFESSIONAL SERVICES <br /> Work Order No. 2 <br /> (Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract#1333 <br /> Indian River County Project#1360 <br /> Time of Completion and Deliverables: <br /> 1. Project shall be completed as follows: <br /> a. 100 % "Paper" review submittal (final review prior to final deliverables) shall be made within <br /> 45 calendar days of receipt of Notice to Proceed for review by County Staff prior to <br /> preparing final submittal package. <br /> b. Time of Final project completion shall be within 10 calendar days of receipt of the County's <br /> review comments from the 100% paper submittal. <br /> 2. Deliverables -The SURVEYOR shall provide the COUNTY: <br /> a. 100% Phase Submittal for County review and comment. All submittals shall include one (1) <br /> paper "hardcopy" along with Autocad files and an ASCII file for all survey points. County <br /> shall strive to provide review comments within 10 calendar days of the preliminary submittal. <br /> b. FINAL Deliverables, Four (4) paper"hardcopy" signed and sealed sets in adequate <br /> recording fashion (I.E. Borders). Sheeted and model space (as applicable) AutoCAD Land <br /> Desktop drawing file compatible with Release 2013, PDF formats and an ASCII file for all <br /> survey points, all electronic files to be on CD. <br /> c. Survey set/sheets shall include a cover sheet with location sketch, survey certifications, and <br /> related title and project number; survey notes, legend and abbreviations and plan view <br /> sheets. <br /> d. Work product and digital versions are to be prepared and submitted so that the County or <br /> other consultants can readily use it for design and analysis of the area, as defined. It shall <br /> contain all information necessary for a third party surveyor to independently recreate or <br /> utilize the survey work. It is acknowledged all final products become property of Indian <br /> River County and will be available for use by the public at large. <br /> e. The SURVEYOR's work product shall meet or exceed the minimum standards defined by <br /> Sections II, Ill and IV or the COUNTY will not approve the SURVEYOR's request for <br /> payment. <br /> Compensation: <br /> Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services <br /> Agreement, Contract No. 1333 with the Indian River County. <br /> I. Project initiation, including review of existing deeds and surveys, files and field notes, <br /> preparation of work orders and field crew folders. Find, recover and measure field ties into <br /> existing survey control along the route to establish the rights of way and baseline of survey. Tie <br /> Horizontal Control to the Florida State Plane Coordinate System, Florida East Zone, NAD 83. <br /> Find and recover existing vertical control. Elevations shall be based upon the North American <br /> Vertical Datum of 1988 (NAVD 88)with a conversion to the National Geodetic Vertical Datum of <br /> 1929 (NGVD 29) provided. Perform bench run and establish benchmarks along the survey <br /> corridor at maximum 600 foot intervals. Field monument baseline control at maximum 600 <br /> intervals. Control points shall consist of iron rod and cap or nail and disk. Control points shall <br /> be designated on survey with station/offset and NAVD '88 elevation. <br /> Masteller, Moler& Taylor, Inc. <br /> 1655 27th Street,Suite 2 <br /> Vero Beach,FL 32960 <br /> Phone: 772-564-8050, Fax: 772-794-0647 <br /> E-mail: dt5243(a�bellsouth.net <br /> 166 <br />