My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br />SITE CLEANUP AND RESTORATION <br />1.1 SCOPE <br />Furnish all labor, equipment, appliances, and materials required or necessary to <br />clean up and restore the site after the construction is completed. <br />1.2 REQUIREMENTS <br />A. During the progress of the project, keep the work and the adjacent areas <br />affected thereby in a neat and orderly condition. Remove all rubbish, surplus <br />materials, and unused construction equipment. Repair all damage so that <br />the public and property owners will be inconvenienced as little as possible. <br />B. Provide onsite containers for the collection of waste materials, debris, and <br />rubbish and empty such containers in a legal manner when they become full. <br />C. Where material or debris has been deposited in watercourses, ditches, <br />gutters, drains, or catch -basins as a result of the CONTRACTOR's <br />operations, such material or debris shall be entirely removed and <br />satisfactorily disposed of during the progress of the work, and the ditches, <br />channels, drains, etc., shall be kept clean and open at all times. <br />D. Before the completion of the project, unless otherwise especially directed or <br />permitted in writing: <br />1. Tear down and remove all temporary buildings and structures; <br />2. Remove all temporary works, tools, and machinery, or other <br />construction equipment furnished; <br />3. Remove all rubbish from any grounds occupied; and <br />4. Leave the roads, all parts of the premises, and adjacent property <br />affected by construction operations, in a neat and satisfactory <br />condition. <br />E. Restore or replace any public or private property damaged by construction <br />work, equipment, or employees, to a condition at least equal to that existing <br />immediately prior to the beginning of the operations. To this end, the <br />CONTRACTOR shall restore all highway, roadside, and landscaping work <br />within any right-of-way, platted or prescriptive. Acceptable materials, <br />equipment,and methods shall be used for such restoration. <br />F. Thoroughly clean all materials and equipment installed and on completion of <br />the work, deliver the facilities undamaged and in fresh and new -appearing <br />condition. <br />G. It is the intent of the Specifications to place the responsibility on the <br />CONTRACTOR to restore to their original condition all items disturbed, <br />destroyed, or damaged during construction. Particular attention will be <br />placed on restoration of canals to equal or better condition than prior to <br />construction. <br />1710-1 01710 Site Cleanup <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1317 -85th St Milling_91st Ave to 101st Ave\Admin\bid documents\Master Contract <br />Documents\01710 - Site Cleanup.doc <br />