My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Provide copies of all permits to the OWNER and ENGINEER and comply with all <br />conditions contained in all permits at no extra cost to the OWNER. If there is a conflict <br />between any permit requirement and these Specifications, the more stringent <br />specification or requirement shall govern. <br />C. In addition to paying for all permit fees, CONTRACTOR shall also pay for all water <br />quality sampling and laboratory tests required by any permit. <br />1.3 GENERAL <br />A. Do not begin any other construction work until the pollution control and treatment <br />system has been constructed in accordance with approved plans and permits and <br />approved for use by the OWNER and applicable permitting authorities. <br />B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br />treatment system and may take effluent samples for analysis by a testing laboratory <br />selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER <br />determines that the pollution control and treatment system is not in compliance with <br />the approved system, the OWNER or ENGINEER will shut the portion of the project <br />down that is not in compliance, and it shall remain shut -down until the pollution control <br />and treatment system is properly constructed or repaired, and complies with the <br />approved pollution control and treatment system plans and specifications. <br />C. Schedule construction to minimize erosion and stormwater runoff from the construction <br />site. Implement erosion control measures on disturbed areas as soon as practicable in <br />portions of the site where construction activities have temporarily or permanently <br />ceased, but in no case more than 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased. In addition to other temporary erosion <br />control measures that may be implemented, application of polyacrylamide is required <br />on all such disturbed areas within 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased, unless final landscaping has been <br />installed. Polyacrylamide application shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water quality <br />violation occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to the <br />Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />01025-5 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1317 -85th St Milling_91 st Ave to 101st Ave\Admin\bid documentsWlaster <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.