My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the following features: two dump straps attached at the bottom to facilitate <br />emptying; lifting loops as an integral part of the system to be used to lift the <br />sack from the basin; and a colored restraint chord approximately halfway up the <br />sack to keep the sides away from the catch basin walls. The colored restraint <br />chord shall also serve as a visual means of indicating when the sack should be <br />emptied. <br />2. Installation: Install in each catch basin in accordance with the manufacturer's <br />specifications. Use as many of the specified filtration devices as required, at no <br />additional cost to the OWNER. <br />3. Product: All materials shall be new and unused. <br />a. "SILTSACK" (regular flow), supplied by ACF Environmental, Inc. (1-800- <br />448-3636). <br />b. "FloGuard+PLUS," supplied by Kristar Enterprises, Inc. (1-800-579- <br />8819). <br />c. Or equivalent. <br />G. Construction Site Egress Driveways: Minimize the transport of sediment and soil from <br />the construction site or work area by vehicle wheels. Construct a crushed rock driving <br />surface at the vehicle exit point(s). Provide an area Targe enough to remove the <br />sediment and soil from vehicle wheels before the vehicle leaves the construction site <br />or work area. Provide wash -down stations as required to wash vehicle tires and retain <br />all washwater on-site. Do not use limerock. <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Crushed limerock shall not be used under any <br />circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate (usually granite), <br />washed and meeting the requirements of FDOT Standard Specifications for <br />Road and Bridge Construction, Section 901. <br />I. Hay Bales; Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to minimize <br />erosion and capture and remove pollutants from the construction site and from all <br />other areas disturbed by construction activities. <br />B. Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 — Erosion & Water Pollution Control - Lump Sum <br />01025-9 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1317 -85th St Milling_91st Ave to 101st Ave\Admin\bid documents\Master <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.