My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION -110 - CLEARING AND GRUBBING <br />The work specified in this item shall conform to Section 110 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction. (2015) with the <br />following modifications: <br />A. Prior to any clearing and grubbing, the contractor will stake the right-of-way. <br />Unimproved areas shall be cleared of trees, logs, stumps, brush, vegetation, rubbish <br />and other perishable or objectionable matter within limits shown on the plans <br />excepting for certain trees and shrubs shown on the plans or as directed by the <br />Engineer which are to remain undisturbed and protected. Stumps and roots between <br />slope stakes in cuts and in embankments 3 feet or less in depth shall be removed to a <br />depth of 18 inches below subgrade. No stumps, roots, or perishable matter of any <br />description shall remain under concrete slabs or footing, including pavement and <br />sidewalks. <br />B. No trees shall be removed or relocated until the Engineer or his representative has <br />marked all trees to be saved, after a review of the project site with the Contractor's <br />representative. <br />C. Where the final pavement or structural work will be close to existing trees, the <br />Contractor shall exercise care in the vicinity of the trees. Further, the Contractor shall <br />saw cut along the edge of the outside limits of the stabilization, structure subgrade or <br />sidewalk to a minimum depth of 4 feet below the finish grade and paint with a <br />commercial grade pruning paint the ends of all sawn roots. If directed by the Engineer <br />or where shown on the drawings, work shall be done by hand in order to protect the <br />trees. <br />D. The Contractor shall exercise care when working in the vicinity of all trees to remain <br />so as to not damage or remove major root structures. The Contractor shall not pull <br />hair or major root structures. All severed roots shall be sawn clean and paint with <br />pruning paint. Stumps, roots, etc., shall be completely removed and disposed of by <br />the Contractor. Undesirable, dead, and/or damaged trees (as so designated by the <br />Engineer) shall be removed. <br />E. All trees to be removed shall be disposed off site; burning will be strictly prohibited. <br />F. All trees or shrubs which are to remain shall be preserved and protected by the <br />Contractor. Where the removal of valuable trees or shrubs specifically for <br />transplanting is required, this work shall be done in cooperation with the Owner and at <br />no additional expense to the Owner. <br />G. All items to be removed shall be excavated to their full depth. All culverts removed <br />from residential driveway entrances within the right-of-way shall become the property <br />of the respective homeowner. Those homeowners not desiring the culverts may <br />donate them to the County free of charge. (See Paragraph C, Special Provisions) <br />The Contractor shall transport the culverts to the County's storage yard. All metal <br />castings for catch basins, manholes, or other structures shall be carefully removed <br />and stored in the County's Storage Yard if they are deemed salvageable by the <br />Engineer. The excavated materials shall be removed from the job site and disposed in <br />a location designated or approved by the Owner. Any culverts, structures or any <br />01025-13 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1317 -85th St Milling_91st Ave to 101st Ave\Admin\bid documents\Master <br />Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.