My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-144
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 2:33:58 PM
Creation date
8/10/2015 1:08:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/14/2015
Control Number
2015-144
Agenda Item Number
8.M.
Entity Name
Dickerson Florida
Subject
Asphalt Millings
Area
Vero Lake Estates
Project Number
1317
Bid Number
2015039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.3 TREE AND PLANT PROTECTION <br />A. Protect existing trees, shrubs and plants on or adjacent to the site that are shown or <br />designated to remain in place against unnecessary cutting, breaking or skinning of <br />trunk, branches, bark or roots. <br />B. Do not store or park materials or equipment within the drip line. <br />C. Install temporary fences or barricades to protect trees and plants in areas subject to <br />traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order to <br />maintain their health during construction operations. <br />F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br />exposed roots with earth as soon as possible. Protect root systems from <br />mechanical damage and damage by erosion, flooding, run-off or noxious materials <br />in solution. <br />G. If branches or trunks are damaged, prune branches immediately and protect the cut <br />or damaged areas with emulsified asphalt compounded specifically for horticultural <br />use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and <br />replace them with a specimen of equal or better quality. <br />I. Coordinate Work in this Section with requirements of other sections herein. <br />1.4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all <br />irrigation systems within the easements, which could be damaged by construction <br />activities. The CONTRACTOR shall repair any irrigation systems damaged by <br />construction activities within two (2) days. Irrigation systems partially within the <br />right-of-way of 85th Street, 99th Court, 100th Avenue, 100th Court, 101st Avenue, <br />102nd Avenue, and all intersecting side streets within project limits may be cut off <br />and capped or connected to same system to maintain functionality. The <br />CONTRACTOR shall be responsible for maintaining the functionality of the <br />remaining portion of the system if it should fall outside of the right-of-way. <br />01541-2 F:\Public Works\ENGINEERING DIVISION <br />PROJECTS\1317-85th St Milling_91st Ave to 101st Ave\Admin\bid documents\Master Contract <br />Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.