Laserfiche WebLink
H. Any redesign of structural members shall be performed by, and the plans signed <br />and sealed by, a Professional Engineer registered in the State of Florida. The <br />redesign shall be at the CONTRACTOR's expense. Any redesign will require an <br />extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br />the Owner for the review cost prior to the Owner's Engineer proceeding with the <br />design review. The ENGINEER's estimated cost of review shall be provided to the <br />CONTRACTOR prior to proceeding with the review to allow the CONTRACTOR the <br />opportunity to rescind the request. <br />I. Engineer will be allowed a reasonable time within which to evaluate each proposed <br />substitution. Engineer will be the sole judge of acceptability and shall have the right <br />to deny use of any proposed substitution. The CONTRACTOR shall not order, <br />install, or utilize any substitution without either an executed Change Order or <br />Engineer's notation on the reviewed shop drawing. Owner may require <br />CONTRACTOR to furnish at CONTRACTOR's expense a special manufacturer's <br />performance guarantee(s) or other surety with respect to any substitute and an <br />indemnification by the CONTRACTOR. ENGINEER will record time required by <br />Engineer and Engineer's consultants in evaluating substitutions proposed by <br />CONTRACTOR and in making changes in the Contract Documents occasioned <br />thereby. Whether or not a proposed substitute is sued, CONTRACTOR shall <br />reimburse Owner for the charges of Engineer and Engineer's consultants for <br />evaluating each proposed substitute. <br />J. Substitute materials or equipment may be proposed for acceptance in accordance <br />with this Section. In the event that substitute materials or equipment are used and <br />are less costly than the originally specified material or equipment, than the net <br />difference in cost shall benefit the Owner and CONTRACTOR in equal proportions. <br />This cost difference shall not be reduced by any failure of the CONTRACTOR to <br />base his bid on the named materials or equipment. <br />+ + END OF SECTION + + <br />01630-3 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1317 -85th St Milling_91stAve to 101stAve \Admin\bid documents\Master Contract <br />Documents \01630 - Substitutions.doc <br />