Laserfiche WebLink
ITEMIZED BID SCHEDULE <br />PROJECT NAME: VERO LAKE ESTATES ASHPALT MILLINGS PROJECT (PHASE 11) <br />IRC. PROJECT NO./BID NO.: 131712015039 <br />BIDDER'S NAME: Dickerson Florida, Inc . <br />W:,:*%-,-diiiii4i rirti4lik ,Amount':: <br />ROADWAY IMPROVEMENTS <br />101-1 <br />MOBILIZATION <br />LS <br />100,000.00 <br />100,000.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />5000.00 <br />5000.00 <br />104-1 <br />EROSION & WATER POLLUTION CONTROL <br />1 <br />LS <br />15,000.00 <br />. <br />15,000 00 <br />110-1-1 <br />CLEARING & GRUBBING <br />1 <br />LS <br />15,000.00 <br />15,000.00 <br />110-7-1 <br />MAILBOX (RELOCATE) <br />146 <br />EA <br />60. 00 <br />8760. 00 <br />120-1 <br />EXCAVATION REGULAR <br />1 <br />LS <br />20,000.00 <br />20,000.00 <br />120-6-1 <br />EMBANKMENT (COMPACTED IN PLACE) <br />1 <br />LS <br />30,000.00 <br />30,000.00 <br />160-4 <br />TYPE B STABILIZATION - (12" SUBGRADE LBR 40) <br />33,472 <br />SY <br />2.00 <br />66, 944 .00 <br />160-4A <br />TYPE B STABILIZATION - (6" SUBGRADE LBR 40) (SHOULDER) <br />16,644 <br />SY <br />2 . 0 0 <br />33,288 .00 <br />283-1 <br />ASPHALT MILLING (8" THICK COMPACTED) (TWO LIFTS) <br />31,650 <br />SY <br />6 . 50 <br />205,725 .00 <br />283-1A <br />ASPHALT MILLINGS (6" COMPACTED) (ONE LIFT) (DRIVEWAYS) <br />1,849 <br />SY <br />6.50 <br />12, 018.50 <br />430-174-112A <br />PIPE CULVERT (12") ACMP <br />1,880 <br />LF <br />25 . 00 <br />47, 000.00 <br />430-174-112B <br />PIPE CULVERT (12") RCP <br />24 <br />LF <br />50.00 <br />1200.00 <br />430-174-115 <br />PIPE CULVERT (15") RCP <br />216 <br />LF <br />50.00 <br />10, 800.00 <br />430-984-121 <br />MITERED END SECTION (12") ACMP <br />56 <br />EA <br />525.00 <br />29,400.00 <br />570-1-2 <br />PERFORMANCE TURF - SOD (BAHIA) (INCLUDES: TOP SOIL, <br />FERTILIZER, AND WATERING) <br />16,468 <br />SY <br />1.75 <br />28, 819.00 <br />700-20-40 <br />SINGLE POST SIGN (STOP) (RELOCATE) <br />21 <br />180.00 <br />3780.00 <br />ROADWAY IMPROVEMENTS SUB TOTAL <br />632,734._ <br />MISCELLANEOUS <br />801 <br />TRENCH SAFETY COMPLIANCE (OVER 5') (SEE SEC. 00454) <br />1 <br />LS <br />500.00 <br />500.00 <br />802 <br />TRENCH SAFETY COMPLIANCE (SHORING) (SEE SEC. 00454) <br />1 <br />LS <br />500.00 <br />500.00 <br />803 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />5000 .00 <br />5000.00 <br />FA -1 <br />FORCE ACCOUNT <br />1 <br />LS <br />20,000.00 <br />20,000.00 <br />MISCELLANEOUS SUB TOTAL <br />26,000.0C <br />OVERALL PROJECT TOTAL <br />658,734.! <br />TOTAL PROJECT BID AMOUNT (IN WORDS): six hundred fifty eight thousand seven <br />hundred thirty four dollars and fifty cents <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED BID SCHEDULE. THE BID SCHEDULE WILL GOVERN. <br />LS = Lump Sum LF Linear Foot EA = Each SY = Square Yard <br />00310-3 <br />FAPublIc Worke1ENGINEERING DIVISION PROJECTS41317-0S1h St Mileng_91al Ave to 101st AvelAdrren1bed documentsWenezed SId Schedule <br />0 <br />50 <br />